Laserfiche WebLink
Mike North Construction <br />800 North Brown Rd. <br />Long Lake Mn.55356 <br />4-14-24 updated new plan <br />Previous bid rescinded. <br />Orono Woods Golf Course <br />Pavilion project,updated version with larger posts,3 per corner <br />40’x 24’x 9’tall open sided,hip roof &hip vaulted paneled ceiling,concrete monolithic slab. <br />Budget Proposal <br />Permit,by others <br />Electrical by others <br />Site sand lift estimate $3,105 <br />Site not prepped,but pretty flat,might need dirt scrapped <br />4”monolithic slab $15,870 <br />40’x 24’,with turned down perimeter 12”x 8” <br />2 courses of rod. <br />2’concrete apron x 40’parking lot side,outside of “footprint”$3,200 <br />If desired <br />Framing materials as designed $32,083 <br />Includes t &g panel ceiling ($9400) <br />Carpentry labor $19,320 <br />Posts to finish <br />Paint and stain as desired $2,350 <br />Roofing materials and labor $3,294 <br />Lift rental $500 <br />Dumpster $500 <br />Grand total $80,222 <br />Thx.Mike North <br />201