Laserfiche WebLink
ABSTRACT OF BIDS * bid amount changed due to found calculation/addition error <br />LURTON PARK IMPROVEMENTS <br />CITY OF ORONO <br />BMI Project Number 0C1.133581 <br />BID DATE:5/1/2024 <br />TIME:9:00 AM 1 2 <br />ITEM APPROX. <br />NO.ITEM NOTES QUANT.UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT <br />BASE BID <br />1 MOBILIZATION 1 LUMP SUM $5,000.00 $5,000.00 $4,000.00 $4,000.00 $5,340.00 $5,340.00 <br />2 REMOVE WOOD BOLLARD (1)10 EACH $100.00 $1,000.00 $100.00 $1,000.00 $71.00 $710.00 <br />3 SAVAGE & REINSTALL FENCE (1)140 LIN FT $50.00 $7,000.00 $65.00 $9,100.00 $45.64 $6,389.60 <br />4 SALVAGE & REINSATALL GATE 1 LUMP SUM $2,500.00 $2,500.00 $1,000.00 $1,000.00 $710.00 $710.00 <br />5 EXCAVATION - COMMON (CV)(P)450 CU YD $40.00 $18,000.00 $45.00 $20,250.00 $37.24 $16,758.00 <br />6 AGGREGATE BASE CLASS 5 (RECYCLE)350 TON $30.00 $10,500.00 $32.50 $11,375.00 $46.37 $16,229.50 <br />7 GRAVEL SURFACING CLASS 5 (100% CRUSHED LIMESTONE)40 TON $35.00 $1,400.00 $85.00 $3,400.00 $48.40 $1,936.00 <br />8 TYPE SP 9.5 WEAR COURSE MIX (2,B)60 TON $125.00 $7,500.00 $125.00 $7,500.00 $183.47 $11,008.20 <br />9 TYPE SP 12.5 NON-WEAR COURSE MIX (2,B)75 TON $125.00 $9,375.00 $125.00 $9,375.00 $164.57 $12,342.75 <br />10 INSTALL BOLLARD 6 EACH $500.00 $3,000.00 $800.00 $4,800.00 $653.33 $3,919.98 <br />11 HYDRAULIC MULCH MATRIX W/ SEED MIX 35-241 (2)450 SQ YD $6.50 $2,925.00 $4.00 $1,800.00 $7.42 $3,339.00 <br />12 4" SOLID WHITE LINE PAINT 630 LIN FT $5.50 $3,465.00 $1.00 $630.00 $1.00 $630.00 <br />13 PAVEMENT MESSAGE PAINT 2 EACH $250.00 $500.00 $250.00 $500.00 $26.25 $52.50 <br />$72,165.00 $74,730.00 $79,365.53 <br />NOTES: <br />(P) PLAN QUANTITY <br />(CV) COMPACTED VOLUME <br />(LV) LOOSE VOLUME <br />(1) POSTS, WIRE FENCE, EQUIPMENT, ETC. <br />(2) INCLUDES FERTILIZER, WEED CONTROL, WATERING & MAINTENANCE, AND 6" TOPSOIL <br />Blackstone Contractors, LLCSunram Construction, Inc.Engineer's Estimate <br />Bolton & Menk, Inc. <br />190