Laserfiche WebLink
Cawlracl Uoit Ouaoiity /\nMMial <br />No. Item Ufiii Ouaniiiy IVks lb Dale To Dale <br />118 Sod with 4 ” loi»oU SY 3J500 2.00 <br />119 Seed w/lo|)soil. uiulcb Sl fertilizer AC 1.0 800.00 <br />120 Geolextilc fabric (Addcuduui 2)SY l.IOO 1.50 1.000 __- I.5UU.00— <br />Total Part B • Restoration S18J130.00 <br />Part C • Lif^Stalioi^#3 <br />I2I Lift Station No. 3 LS 1 40.450.00 50%■»n <br />Total Part C • Uft Sla. #3 S20.225.00 <br />Total Part A • Sanitary Sewer 50.745.50 <br />Total Part B • Restoration 18.230.00 <br />Total Part C • Lift Sta. 3 • Beilerwood -*n ■»”»< on <br />TOTAL ALTERNATE NO. 1 - BEDERWOOD $89,200.50 <br />ALTERNATE NO. 2 • BAYSIDE NORTH <br />Psirt A • Sauilarv Sewer <br />122 8’ PVC. SDR 3.5. 0*-8’ tieep in place IJ-140 13.00 <br />123 8‘ PVC. SDR 35. 8'-10 ’ deep in place U'225 13.00 <br />124 8'' PVC. SDR 35. 10 ’-12 ’ deep in place 1.1-85 14.00 <br />125 8- PVC. SDR 35. I2* I4* d^ep in place i.r 225 15..50 <br />126 Sid. MH 8' dp.. 4' dia.. W/RI642B csig.llA 3 IJ.50.00 <br />127 Manliolc depth greater than 8’ deep LF 6 90.00 <br />128 8” DIP. outside drop IJ-6.5 250.00 <br />120 8* « 4" PVC service wye branch EA 6 60.00 <br />130 4 ” PVC service pipe in place U-105 15.00 <br />131 4 ” PVC service riser pipe in place IF 10 15.00 <br />132 Improved pi|)e fdo. in 6” .ucreuicul de|ilb l.l-500 2.00 <br />1.33 Mechanical trench conipaclHiu IJ-810 1.00 <br />134 Sanitaiy sewer television <br />inspection (Addenduui 2)IJ-675 0.65 <br />Total Part A ■ Sanitary Sewer $0.00 <br />Part B • Restoration <br />135 Tree removal FA 50 115.00 <br />136 SiiJ wiih 4" lofisoil SY 2.000 2.00 <br />l3«7RrP Kl* ^