Laserfiche WebLink
CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AIA DOCUMENT C701ICM <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />PROJECT: <br />(name, address) <br />TO (Contractor): <br />urono City Hall and <br />Public Works Buildings <br />Crystal Bay, MN 55323 <br />Grosser Concrete/Masonry <br />1771 Yankee Doodle Road <br />Eagan, MN 55121 <br />Y^u are directed to make the following changes in this Contract: <br />Add to contract for additional work required <br />to remobilize for slab on grade work and <br />extra work required at hoist pits. <br />CHANGE ORDER NUMBER: Three ( 3 ) <br />Nr'MIONDATE: October 21, 1992 <br />ARCHITECT'S PROJECT NO: 1124.04 <br />CONSTRUCTIO.s MANAGER'S <br />PROJECT NO: 4959 <br />CONTRACT FOR: Concrete/Masonry <br />CONTRACT DATE: November 11, 1991 <br />Add: $1,331.00 <br />Not valid until signed by the Owner, the Architect and the Construction Manager. <br />Signature of the Contractor indicates atsreement herewith, including any ad|ustment in the Contract Sum or the Contract Time. <br />181.827.00 <br />9,057.00 <br />190.884.00 <br />The original .Contract Suni) was................................................ $ <br />Net c’lange by previously authorized Change Orders.......H.l.».. #.2 ....................................... $ <br />Th*> (Contract SutTi) ai(XXMj(iKm(X^XRr>'ior to this Change Order was ... $ <br />The (Contract Sum) be (increasedK^JCJQiX^j) SJMm <br />by this Change Order ....................................................................................................... j 1,331.00 <br />The new (Contract Sum)x>J4»H«««StJtR'rt(»W3(KI) including this Change Order will be...$ 192,215.00* <br />The Contract Time wll b|CK0CT3(Kd«*XPt)^Xd) (unchanged) by ( ) Q^yj ’ <br />The Date o( Substantial Completion as of the dale of this Change Order therefore is DGC0mbsr 31, 19 92 <br />Recommended: <br />Kraus-Anderson Construction Company <br />CONSTRUCTION MANAGER <br />Minneapolis, MN 55404 <br />ADORES <br />rproved: <br />Boa\man Kroos Pfister and Associates <br />lo-ea-se.. <br />DATE <br />Agreed To: <br />Gresser Concrete/Masonry <br />contractor <br />Eagan, MN 5 51 <br />AUDI <br />Authorized: <br />City of Orono <br />^Cr^ystal Bay, MN 5 5323 <br />‘hi ADDRESS <br />DATE <br />CAUTION. ,ou should sign an original AIA document which has this caution pdiied In red. <br />An original assures that changes will not be obscured as may occur when documents are reproduced. <br />MK OOCUMiNT C7il CM. • C ma .n GI ORD R • CONSTRUCTION MANAfrEMlNT ED^'ON # jUNT IW lOtTlQN • <br />9 tMC • TiiE A.V1R»CAN institute Of ARCHITECTS 17JS NEW YORK AVENUE. NW , WASHINGTON. DC TOOCio G701/CM —1980 <br />WABNiNO: Unllc^nMd photocopying violatot U S C'^nyrlght liwi ind If f l » ItgAi pfOMCution.