My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-1992 Council Packet
Orono
>
City Council
>
1992
>
11-09-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 1:38:30 PM
Creation date
4/22/2024 1:34:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AIA DOCUMENT C701/CM <br />PROIECT; <br />(name, address) <br />TO (Contractor): <br />Orono City Hall and <br />Public Works Buildings <br />Orono, MN <br />Jansco Caulking <br />6200 So. Linwood Drive NB <br />Wyoming, MN 55092 <br />Distribution to: <br />OWNtK □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />CHANGE ORDER NUMBER: One ( 1) <br />INITIATION DATEiSoptcmber 24, 1992 <br />ARCHITECT'S PROIECT NO: 1124.04 <br />CONSTRUCTION MANAGER'S <br />PROIECT NO: 4 059 <br />CONTRACT FOR: Sealants/Caulking <br />CONTRACT DATE: <br />You are directed to make the following changes in this Contract: <br />Furnish additional labor and material necessary <br />to do caulking work as required according to <br />Proposal Request No. 6.Add: $70.00 <br />Not valid until signed by the Owner the Architect and the Construction \Undger. <br />Signature of the Contractor indicates agreement herewith, including anv adjustment in the Contract Sum or the Contract Time. <br />3,950.00 <br />-0- <br />3,950.00 <br />The original (Contract SumiXOGXXiXKiirXiM} XiKXK'XH was ..................................................... S <br />Net change by previously authorized Change Jrders ..................................................................... $ <br />The (Contract Sum) KXXrXiKdOS}{XiXiXXiK[}CXXt) prior to this Change Order was ................ $ <br />The (Contract Sum) XXiXiXdfXiXDfXXXXiXOtXXl) will be (increasedKXKXJOCXiXXiXJfilfi^X <br />by this Change Order.................................................................................................................... $ 70.00. <br />. z new (Contract Sum) (}|(X«TCK‘X<XX')MCK'X!Xi(7fX including this Change Order will be ... $ 4,020.00. <br />The Contract Time will beXK<XX>)OI^XO^P!X‘XXX' (u* changed) by ( ) Days. <br />The Dale of Substantial Completion as of the date of this Change Order therefore is December 31, 1992 <br />Recommended: App/Vived; <br />Krniig-AnrlfsrKnn Cnrif^f rnrf-. i on Cnmpnny <br />CONSIRUtTIO.N MANACLR <br />Min neapolis, MN 55404 <br />ADORE <br />Rro^Aninn Kroofi Pfister and Associates <br />AKCllI rtcT <br />rtrleapolis <br />DATE <br />IN 55401 <br />/ <br />'^OATt <br />Agreed To; <br />Tongfo PmiTWing <br />CONTRACTOR <br />Wyoming, MN 55092 <br />ADORE <br />^ DATE <br />Authorized: <br />C i t-y n F_Quono_____________ <br />OWNIR <br />Crystal Bayy MN 55323 <br />ADDRESS <br />DATE <br />AIA DOCUMfNT C701/CM • CHASCC OROEft • CONSTRUCTKJN MANACiEMENT EDITION . JUNE 19«0 EDITION • AIA« <br />^ 1W) • THE AMERICAN institute Of ARCMIttCTS, 17JS NEW X)RK AVENUE. NW. WASHINGTON DC ri701/CM —1980 <br />Warning Unllr^nned priotoconvinq vlolat»« U S and It siibEtct to leqtl prottcution.
The URL can be used to link to this page
Your browser does not support the video tag.