My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-1992 Council Packet
Orono
>
City Council
>
1992
>
11-09-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 1:38:30 PM
Creation date
4/22/2024 1:34:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Review^ Subdivision #1771 <br />October 13, 1992 <br />Page 2 <br />U <br />LOT 2 <br />Soil testing and septic system design have been approved for <br />a 5-bedroom home including primary and alternate drainfield <br />sites. Both sites meet MPCA rules Chapter 7080 as well as Orono <br />City Code Section 12.30 requirements. Specific septic system <br />details are included below: <br />- Designed for a 5-bedroom house. <br />Depth of seasonal saturation (mottling) is 1' to 2' for <br />both primary and alternate drainfield sites. <br />Slope at the primary and alternate drainfield sites is <br />2% and 5% respectively. <br />- Percolation rates average 5.1 minutes per inch at 12" <br />and 18". <br />Topographic location and site drainage is adequate. <br />All setbacks meet City Code. <br />Summary <br />Staff recommends approval of the subdivision based on soil <br />testing from S-P Testing, Inc. dated November 20, 1989 as updated <br />October 1992. Several conditions are recommended for the <br />approval of this subdivision and are listed below: <br />1. <br />2. <br />3. <br />No excavation, construction, or compaction shall *'e allowed <br />within 40' of the proposed primary treatement area for Lot <br />X • <br />No excavation, construction, or compaction shall be allowed <br />on that portion of the north lot line which is south of the <br />proposed alternate drainfield site for Lot A <br />All four drainfield sites must be fenced off using snow <br />fencing to prevent compaction of these sites prior to any <br />traffic being allowed on this property and prior to plat <br />approval. <br />Isv
The URL can be used to link to this page
Your browser does not support the video tag.