My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
04-22-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 9:54:04 AM
Creation date
4/22/2024 9:45:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 9, 2024 2 <br />within the permit area. Non-fee title property rights (i.e. easements and permits) <br />conveyance documents shall adhere to typical public trailway easement and <br />permanent irrevocable permit (in the general form attached hereto as Exhibit B) <br />unless otherwise agreed upon by both parties. <br /> <br />Park District may at its sole discretion acquire permanent and temporary property <br />rights for purposes of creating a continuous and contiguous Regional Trail corridor <br />from willing sellers. In such cases where Park District acquires permanent property <br />rights, City shall approve via resolution Park District’s acquisition of property rights <br />so long as the acquisition is consistent with the approved route as shown on Exhibit <br />A, or is otherwise acceptable to City. <br /> <br />In the event City’s property rights along Ferndale Road which allow for the Regional <br />Trail are lost by vacation, condemnation, revocation of license or permit, or <br />otherwise, City will acquire such additional rights, titles and interests as are needed <br />to provide a continuous and contiguous Regional Trail corridor at City expense. If <br />the City’s loss of such right occurs after construction of the Regional Trail, the City <br />shall reconstruct the Regional Trail, if necessary, at City expense, subject to credit <br />for any compensation Park District may receive for loss of its Regional Trail. <br /> <br />In locations where the City meets its Easement responsibilities via an irrevocable <br />permit and license, the City represents that it currently has or will obtain the legal <br />right and authority to construct, maintain, and operate Regional Trail within the <br />permit area. <br /> <br />The parties recognize that certain Trail segments and road/railroad crossings may <br />require agreements with third parties such as the Minnesota Department of <br />Transportation (“MnDOT”). The parties to this Agreement shall cooperate to secure <br />necessary permissions to use such crossings and bridges. In the event that <br />necessary permissions cannot be secured, this Agreement may be terminated by <br />either party provided that monies due to either party is first paid. <br /> <br />C. Design and Construction. Design and construction of the Regional Trail and <br />associated structures and road crossings shall be in accordance with the Regional <br />Trail Standard Details (Exhibit C) and standards and guidelines adopted by the Park <br />District. The Park District will have final discretion over regional trail and safe <br />crossing design and the interpretation and execution of engineering best practices. <br /> <br />i. Design and Construction by Park District. The Park District will coordinate <br />and fund design of Regional Trail and related structures. Park District may, in <br />its sole discretion, contract with consultants to provide professional design <br />services including, but not limited to design development, bidding documents, <br />construction plans and specifications, contract document preparation, <br />construction administration, and project close out. Park District shall submit all <br />Regional Trail plans to City for review and approval, provided however, that <br />approval shall not be unreasonably withheld. <br /> <br />Park District shall be responsible for bidding and construction of the Regional <br />Trail and related structures in accordance with approved construction plans and <br />specifications. Construction shall commence following (1) conveyance to Park <br />District of Easements in accordance with Paragraph B – Property Rights of this <br />Agreement, (2) Park District and City approval of plans and specifications for <br />133
The URL can be used to link to this page
Your browser does not support the video tag.