My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-1992 Council Packet
Orono
>
City Council
>
1992
>
10-12-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 2:15:02 PM
Creation date
4/16/2024 2:11:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-~T—*•menmrds V'.^ <br />H^^5£i7i3S5BSS58^^^t^S»JS5wjiIu^55!S?^ <br />n^m <br />Ig^'-K^l 0J)_p U) D) VD g 0 3j DJ <br />1. GENERAL <br />Prior to beginning construction, the area selected for the shed location must be leveled and <br />cleared of obstructions. <br />2. INVENTORY <br />Separate all lumber, hardware, etc. into individual stacks of like items. <br />3* I'll AME <br />PJlKi'ARATION <br />Unfold each frame, setting <br />aside two frames to be used <br />as end walls. From l"x4" <br />Pine boards, cut Gusset <br />plates 6" long.20 for a 10' <br />building. 24 for a 12 ’ <br />building or 28 for a 14 ’ <br />building. Apply gusset plates <br />on each side of the top and <br />bottom fold locations. <br />Frames to be used as end <br />walls require only one gusset <br />plate at top and bottom on <br />the side opposite of the <br />metal plates. Use four 8d <br />nails on each gusset plate. <br />See Figure 1.i-i/i . <br />plat« at top <br />fold location <br />Sida Wan Frame <br />M«> <br />Treated <br />Bottom Frame <br />Mea <br />X"x4"K*" <br />tone C*** <br />at bottom fold <br />I <br />• I t^eeio*«o <br />•V*' <br />EZ BUILD SHED FRAME
The URL can be used to link to this page
Your browser does not support the video tag.