My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-1992 Council Minutes2
Orono
>
City Council
>
1992
>
09-28-1992 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2024 12:39:11 PM
Creation date
4/15/2024 12:36:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO BUDGET UPDATE <br />ORONO CITY HALL & PUBLIC WORKS BUILDINGS <br />PROJECT BUDGET <br />i <br />ADDS TO PROJECT SINCE MAY 5th <br />^ [testing costs <br />PROJECT CONTrJGENCY <br />ADDITIONAL EARTHWORK <br />CONCRETE 4 MASONRY REVISIONS AT PUBUC WORKS <br />CONCRETE REVISIONS TO CITY HALL <br />REVISIONS TO WATER SERVICES <br />DEPT OF CORRECTIONS SECURITY REVISIONS <br />ADD ROOF TO KENNEL <br />ADD ICE 4 WATERSHIELD TO CITY OFRCES <br />CAULK ROORS AT PUBLIC WORKS '__ <br />revis 'kdns to hollow metal <br />ADD RADO OPERATORS FOR GARAGE <br />ADD ROOR SEALER TO PUBLIC WORKS GARAGE <br />PUBUC WORKS STRUCTURAL REVISION <br />MASONRY R^SKDNS to ALL BUILDINGS <br />MLLVt^k REVISIONS TO PROPOSED BUDGET <br />BUILDING INSULATION BID REVISION <br />CERAMIC BID REVISION <br />RECTRICAL REVISIONS TO PROPOSED BUDGET <br />PUBUC WORKS CANOPY <br />DENTILS IN PROJECT <br />USE POLY STYRENE ISOLATION IN LIEU OF BEAD BOARD <br />...-.1. <br />DEDUCTS TO PROJECT <br />OWNER TO INSTAR CULVERTS AT PUBLIC WORKS <br />REVISIONS TO ALUMINUM WINDOWS <br />COLD STORAGE BUILDING BID SAVINGS <br />FF 4 E BUDGET REVISION j <br />SAVINGS ON ROOF EDGE DETAILS <br />STEEL ERECTION BID SAVINGS <br />HOLLOW METAL 4 HARDWARE SAVINGS* <br />REC.DMENDED DEFERED AND DELETED ITEMS <br />DELETE METAL DENTILS <br />■ DELETE COLUMNS 4 CANOPY AT PUBUC WORKS <br />(^$21,000) <br />($5,072) <br />($10,516) <br />($2,206) <br />($12.129) <br />1$24.10J) <br />($2,159) <br />($3,468) <br />($2,300) <br />($2,042) <br />($1,403) <br />($0,850) <br />($3,278) <br />($14,374) <br />^10.919) <br />($4,040) <br />[^($1,292) <br />(^$14.75^ <br />($5,770) <br />ill 1.350) <br />($1.350) <br />TOTAL <br />CURRENT CONTNGENCY <br />DEFER COLD STORAGE BUILDING <br />DEFER SECURITY CAMERAS <br />DEFER ROOF AT KENNEL <br />I <br />$12,820 <br />$2,901 <br />$9,352 <br />$7,077 <br />$8,205 <br />$3,000 <br />$11,264 <br />9/28/92 <br />$4.J075.500 <br />$100,000 <br />($162.374V <br />TOTAL <br />T' <br />$7,000 <br />$8,000 <br />$69,000 <br />$13,000 <br />$2,159 <br />$54,626 <br />15^7,748), <br />REMAINING CONTINGENCY <br />TOTAL <br />--t <br />$99,159 <br />$91.411 <br />Pag« 1
The URL can be used to link to this page
Your browser does not support the video tag.