Laserfiche WebLink
1. Item Uoii <br />Om tract <br />Quoulity <br />Unit <br />i*rioc <br />Ouanlily <br />'Po Date <br />Amount <br />111 Dale <br />Addendum No. I - Part B - Water Main <br />54 Casing for 8" DIP IF 45 118.00 45 5.310.00 <br />55 Casing for 12" DIP LF 60 IIS.OO <br />Total Addendum No. 1 $5,310.00 <br />Change Order No. 1 <br />56 6” DIP, Cliiss 52 water main LF 50 L5.60 43 670.80 <br />57 8" DIP, Class 52 water main U'(.15)15.60 <br />58 12” DIP, Chess 52 water main LF 410 20.85 410 8.548..50 <br />59 16 “ DIP, Class 52 water mam LI-250 28.00 250 7,000.00 <br />60 6“ resilient wedge GV and box L-A 340.00 680.00 <br />61 8“ resilient wedge GV and box 1-A (I)440.00 <br />62 12" bulterlly valve and box I'j\0 795.00 12590.00 <br />63 16" butterfly valve and box FA 1,6<)0.00 3.320.00 <br />64 5" vah'c hydrant l-A 1.100.00 22100.00 <br />65 Connect to exist, water line (wet lap)FA (0 1.440.00 <br />66 C.I. fittings I.H 2.000 0.85 2.000 1.700.00 <br />67 Meehanical trench compaction <br />68 Improved pipe iouudalioii per 6" <br />LF 670 0.20 703 140.60 <br />depth iticrements in place U-130 0.30 150 120.00 <br />69 C;ising for 12" DIP LF (frf))118.00 <br />lolal Change Order No. 1 <br />Chani!C Order No. 2 <br />70 Cheis 5 100% crushed quarry <br />limestoue a^^gregalc base <br />Total Change Order No. 2 <br />Total Pari A - Sanitary Sewer <br />'roial Part H - Water Main <br />Tc»tal Part C • Storm Sewer <br />Total Part D - Street <br />Total Addeiidiini Nii. I <br />Potal diaiige Order No. 1 <br />Total ('hauge Order No. 2 <br />'Potal Work Completed to Dale <br />1393 l.RM' <br />Ion 250 9.50 250 <br />UP 3 <br />S25.969.90 <br />7.175 nn <br />S2J75.00 <br />18.825.05 <br />40.947.75 <br />18.H15.20 <br />99.713.50 <br />5310.00 <br />25.909.90 <br />2.175 on <br />$211,956.40