Laserfiche WebLink
r <br />llcm <br />Part H • l^cstoratioii <br />164 Remove existing bituminous <br />165 Commuu excavation <br />166 CLiss 5 aggregate base (100% crushed) <br />167 Pype 31 bituminous b;ise course <br />168 Ty|>e 41 bituminous wearing course <br />169 AC-1 bituminous material for mix <br />170 Bituminous material for «aek coal <br />171 Bituminous material for pateliing <br />172 13’*R(:P,rhiss5iuplace <br />173 15" KCP, Class 4 in place <br />174 18" RCP. Class 4 ill place <br />175 33" RCP. Chiss 3 in place <br />176 48’ RCP, Class 3 in place <br />177 12" RCP flared end in place <br />178 15" RCP Hared end in place <br />179 18" RCP flared end ill place <br />180 33" RCP Hared end w/tr;ish guard in pi. <br />181 48" RCP Hared end w/trasli guard in pL <br />182 Mechanical trench compaction <br />183 Inipr. |)ipe fdii. in 6" increment de))th <br />184 Remove existing CMP culvert <br />185 Tiller lilaiiket m place <br />186 Riprap in place <br />187 'Prec removal <br />188 Sod with 4" topsoil <br />189 Seed with tofisoil. mulch &, fertilizer <br />P>() Cieotextiic fabric (AdJcuduni 2) <br />I Dial r*arl B - Restoration <br />I’otal Part A - Sanitary Sewer <br />I'otal Part B - Restoratmn <br />10IAL ai;ii:rna it; no. 3 - cvcNirr plah: <br />I3937.uri* <br />Uoil <br />RP-7 <br />C'onl/aci <br />Ouanltiy <br />Unit <br />l*rioc <br />OuaDtiiy <br />To Date <br />Aiuuuul <br />l a Date <br />SY 10.800 1.80 <br />CY 4.500 4.40 <br />IN 6.000 8.50 <br />IN 1.500 14.50 <br />IN 1.200 L5..50 <br />TN lf)0 12:j.oo <br />CJI.750 IJO <br />SY .KHJ 22.0(J <br />II-.300 17.50 <br />I.I-30 10.00 <br />U-75 21.00 <br />I.F UK)33.00 <br />U-80 81.00 <br />I-A I2 36.5.00 <br />I-A 300.00 <br />I-A 4 410.00 <br />i:a 1 2.500.00 <br />I-A 2 2.665.00 <br />LF 405 1.00 <br />LF 4(H)2.00 <br />LI’405 3.00 <br />SY 25 2.50 <br />C'Y 50 50.00 <br />li/\15 115.00 <br />SY 7.500 2.00 <br />AC 2.0 800.00 <br />5.500 1.50 <br />9.500 17.100.00 <br />Sl7.l(K).00 <br />0.00 <br />_17.I00.00 <br />$I7.I(M).00