Laserfiche WebLink
it <br />Tot^ <br />ITEM 11 DESCRIPTION OF WORK 1 SCHEDULEDNo.1 1 VALUEA1 B11 1 c111 Demolition 1 $1.650 00211 Sitework 1 $750 00 <br />3 <br />1 <br />1 Concrete & Hatch 1 $7.900 00 <br />4 <br />1 <br />1 Alum Ladder 1 $1.500 00 <br />5 <br />1 <br />1 Pumps & Control Panel <br />1 <br />1 $26,000 00 <br />6 <br />1 <br />1 Piping & Valves 1 $7.500 00 <br />7 1 Eletilcal <br />1 <br />I _______ <br />1 $1.500 00 <br />1 Sub-total <br />1 _______ <br />1 $46.800 00 <br />1 <br />1 CO#1 Temp Pumping 1 $8.200 00 <br />I WORK COMPLETEDPreviousApplicationsDI <br />$55,000.00 <br />ThisApplicationE$1.650 00 <br />$5.300 00 <br />$200 00 <br />$7,150.00 <br />$4,400.00 <br />$11,550.00 <br />STOREDMATERIALSF TOTAL COMPLETED AND S i ORE D TO DATEG(D+E+F) _____$1.650 00 <br />$5,300.00 <br />$200.00 <br />$11,550.00 <br />%100 00 <br />67.09 <br />13.33 <br />$7,150.00 15 28 <br />$4,40000 53.66 <br />21.00 <br />BALANCE TO FINISH H(C-G) <br />$750 00 <br />$2,600.00 <br />$1,500.00 <br />$26,000.00 <br />$7,500 00 <br />$1,300.00 <br />$39,650 00 <br />$3,800.00 <br />$43,450.00