My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cert. Site Plan- Orono PW_Resubmit_Civil,Arch,LA_2022.12.15 with markups
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0365 Old Crystal Bay Road North- 33-118-23-31-0013
>
Permits/Inspections
>
Cert. Site Plan- Orono PW_Resubmit_Civil,Arch,LA_2022.12.15 with markups
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 8:21:10 AM
Creation date
4/10/2024 8:20:51 AM
Metadata
Fields
Template:
x Address Old
House Number
365
Street Name
Old Crystal Bay Rd N
Address
365 Old Crystal Bay Rd N
Document Type
Survey
Permit Number
CPS22-000006
PIN
3311823310018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File #:22-000485 <br />Permit #:CPS22-000006 <br />Address:365 Old Crystal Bay RD North <br />Orono MN 55356 <br />Description:Orono Public Works Facility <br />Document:Cert. Site Plan- Orono PW_Resubmit_Civil,Arch,LA_2022.12.15.pdf <br />1.1 G. Comment, Adam Edwards <br />Comment: SWPPP - Stockpile: Any soil or dirt storage piles containing more than ten cubic <br />yards of material should not be located within 25-teet from a roadway or drainage channel. If <br />remaining for more than 14 days, they shall be stabilized by mulching vegetative cover, tarps or <br />other means and enclosed with down gradient perimeter sediment controls. Piles which will be in <br />existence for less than 14 days shall be enclosed with perimeter sediment controls. <br />Comment: SWPPP: The site must have a construction entrance (per city standard detail) that <br />must be provided and maintained. <br />Comment: SWPPP - Sediment/Erosion Control: Perimeter sediment control measures should be <br />installed by the contractor and inspected by the City prior to any work, including demolition. The <br />contractor must provide a minimum 24-hour notice prior to inspection. <br />Comment: SWPPP - Street Cleaning: Streets shall be cleaned and swept within 24-hours <br />whenever tracking of sediments or soils occurs and before the site is left idle for weekends and <br />holidays. <br />Comment: Adjacent roadway, curbing and drainage structures must be protected.
The URL can be used to link to this page
Your browser does not support the video tag.