Laserfiche WebLink
CONTINUATION SHEET AIA DOCUMENT 0703 dnstruclions on rt'versi* skip) iw(.i 3 of ^rAC'.is <br />AIA Document C702, APPLICAIION AND CCRTIflCATE FOU PAYMENT, cont.iininj; <br />Contractor's signed Certification is attached. <br />In tabulations below, amounts arc stated to the nearest dollar. <br />Use Column I on Contracts where variable retamage for line items may apply. <br />APPIICATION NUMBER: 5 <br />API’LICAIION DAIE: 7-25-92 <br />PERIOD lO: 7 ‘2 <br />ARCMlTECrS PROiECT NO: <br />A B c:0 E F C H 1 <br />ITEM DESCRIPTION OF WORK soimuiii)WORK COMRlEUn MATERIALS TOIAE %BALANCE RIIAINAGE <br />NO.VA1.UL FROM PREVIOUS <br />APPIICAIION <br />(1) ♦ n <br />THIS PERIOD PRESENTLY <br />STORED <br />(NOT IN <br />D OR E) <br />COMPl ETED <br />AND STORED <br />TO EMTE <br />(D-FE4-F) <br />C-C)TO FINISH <br />(C-G)10% <br />1 Base Bid: <br />Including sand, <br />pumpwater, rip rap, <br />GeoTex Tile i;^er <br />rip rap and mark up. <br />34,800.00 31,980.00 2,900.00 34,880.00 100 -0-3,488.00 <br />2 Performace Bond 766.00 950.00 -(184.00)766.00 100 -0-76.60 <br />3 Drop Manhole <br />$1,500.00 plus <br />ten perc:ent (10%) <br />overhead & profit. <br />1,650.00 1,650.00 <br />1,650.00 100 -0- <br />m <br />165.00 <br />4 Rock Bedding <br />135 tons ^ $12.00 <br />plus ten percent <br />(10%) overhead & <br />profit <br />1,702.00 1,782.00 <br />• <br />A. <br />1,782.C3 100 -0-178.20 <br />39,078.00 36,362.00 2,716.00 39,078.00 3,907.80 <br />AIA DOCUMENT C7IO * M^ICATtON rTRTiriCATf roK PAYMINl - MAY l'l«1 M^IIION • AIA» • e ISfll <br />IMt AMIRICAN INMITUTI OF AROnTrCTS, amnui . N.VV. WAMMNr.lfiN, Of C70T-inB1