My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1992 Council Packet
Orono
>
City Council
>
1992
>
08-24-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:01:59 PM
Creation date
4/9/2024 2:58:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l/1laonMtro0 Owner City of Orono, PO Box 66, Crystal Bay, MN 55323 Date July 8, 1992 <br />mAndtrhk 4 Contractor Progre^ive Contractors, Inc., 8736 21achary Lane, Ossco, MN 55369 OuiQgc Order No. 1 <br />Bond Co.Not available yet <br />CHANGE ORDER NO. 1 <br />Stubbs Bjy <br />Sanil^iry Sewer luiprovcmcnts <br />File No. 13'J37 <br />Deagriptinn nf W»rlr <br />Cbiingc Lift Stulion No. 3 from a duplex grinder station to a duplex Don-clog submersible station. Replace Sheet 25 with Modified <br />Sheet 25. Delete Specification Sections 11113 and 16903. Modify Spec. Sc on 11114 - 1.07.D to read Flygt CP 3102, Impeller <br />433. 240 volt, 3 phase, 5 HP. Design condition is 100 GPM at 35 feet T.D.H. .lakc the following changes to Specification Section <br />16904.2.08.B.1 Lift Station No. 3. 240 volt, 3 phase. 4 wire, 60 H/.. and Section 2.08.B.3.b. Lift Station Nos. 2 and 3 shaU both <br />have 60 amp 3 pole interlocking breakers. Power factor capacitors will not be required. 1 I\is change oruer ADDS $9390 to the <br />contract araount. <br />turn <br />Change Order No. 1 <br />Uull <br />Contracl <br />QiMuiilljr <br />Modify Lift Station No. 3 <br />Total Change Order No. I <br />LS <br />Doll <br />Price <br />93'>0.00 <br />TeUI <br />Amsiinl <br />9390.00 <br />$9,390.00 <br />Original Contract Amount <br />Previous Change Orders <br />This Change Order No. I - ADD <br />Revised Contract Amount (including this Change Order) <br />I3937.au <br />1,480,331.95 <br />0.00 <br />9390.00 <br />1,489,721.95
The URL can be used to link to this page
Your browser does not support the video tag.