Laserfiche WebLink
&/: •: <br />'J. <br />s- <br />:v. <br />>r: <br />.r' . <br />3293 fable Tvoe Anchorage (where snecifiedl: <br />31931 Winches and winch stands shall be so mounted as not to protrude into <br />the finger pier walking surface or clear width of the main or tee <br />piers. If not shown on the drawings, the minimum clear width is five <br />feet. In addition, winches and winch stands shall be so mounted as <br />not to interfere with moored craft. <br />31932 Winches shall be mounted high enough on the winch stands to allow <br />full swings of the cranks to be easily made by the operator/s. <br />1 9 3 3 'Jinches shall be so designed and mounted on the pier to keep changes <br />direction as well as the number of rollers, pulleys and eyes <br />over which the cables ride from winches to anchors as few as <br />practical. <br />3 1 9 3 4 The under water exit of the cable shall be deep enough to clear all <br />power and sail boats normally using the water area over the cable. <br />For design purposes the deepest draft of craft using the 30,38,45 and <br />60 foot long finger pier slips are 7, 8, 10_and 12 feet, respectively. <br />The deepest draft of craft mooring broadside to main, tee and service <br />pier, shall be.12 feet. For purposes of design, the drafts shall be <br />considered to be below a plane feet below low water datum. <br />3.1.9.3.5 Anchors for winch-cable systems, if not shown on the drawings, shall <br />be of a concrete gravity type or fluke type of a size and configura­ <br />tion providing anchorage capacity of at least twice the calculated <br />anchorage loads. <br />NOTE:Add appropriate technical specifications for execution where <br />required for electrical, water, sanitary pump-out, fuel service, <br />telephone and cable television if they are to be included in this <br />section of the specifications. _ _ _ <br />3.1.10 <br />3.1.10. <br />Installation: <br />The pier manufacturer shall provide a full time superintendent at <br />the job site to supervise and coordinate the unloading, assembly and <br />installation of the floating pier system including anchorages, bridges <br />and utilities as well as to coordinate pier related activities with <br />those activities that are the responsibility of other trades and/or <br />contractors. <br />3.1.10.2 A laxinum ununt of fabrlcition and assembly shall be <br />pier manufacturer's plant rather than on the job site. If utilities <br />are part of the work, as much of the utility systems as practic <br />shall be installed in the floating pier manufacturer s plant either by <br />their own qualified personnel or by bringing qualified contracto s <br />into their plant. The only exception is where utilities easily be <br />installed on site by merely leaving the deck off until utilities are <br />- 19 <br />if. . <br />L'*'V ■ i