Laserfiche WebLink
|s-fe.^**'**. <br />%■ <br />tl?''.'.mr <br />Ct ' <br />f ■ <br />I:'fe>r <br />^iv',:-- <br />'■J ••' ■ <br />rt <br />E-^iJ <br />t'SV"-^m <br />I',' <br />•'J^' <br />% <br />ny< <br />m <br />!tei:- <br />mm <br />:r*\.* •’ ■ <br />#■ <br />V- <br />'"'f <br />T. Preparation of tdnterization manual. <br />U. Calculations for current and t ds loads. <br />V. Review of layouts for ease c; winterization. <br />N. Guidelines for design of new flotation imits. <br />X. Review of anchorage design on nunerous projects for same floating dock <br />manufacturer. <br />Y. Analysis of new dock design with recarmendations for strengthening and <br />anchoring plus tests and analysis of flotation material. <br />Z. Analysis of cause ior failure of floating dock cantilevered finger and <br />other docks due to overload by comnercial ships turning in a narrow <br />river within a few feet of docks. <br />AA. Review of new steel frame dock design with reccnmendatians for <br />t^grading. <br />AB. Coordinate and provide design and marketing guidance for dock system to <br />be standardized for handicap access. <br />AC. Seminar on history of metal framed floating dock systems and review of <br />design for new steel frame floating dock system. <br />AD. Testing and evaluation of flotation units to see if they met <br />specifications on a Southern state project. <br />AE. Review of new structural frame design for proposed floating dock <br />system. <br />AF. Design anchorage system for floating fishing pier. <br />AG. Prepared installation and yearly removal instructions for three marinas <br />located on rivers with ice flow. <br />AH. Provided r^ort on design of spud anchorage systems. <br />AI. Review of bid docisnents for errors, omissions and problems prior to <br />pr^aring bid proposal. <br />AJ. Research and report on deck material. <br />AR. Review of plans for dock built of recycled plastic lunnber with <br />reconmanded changes and inprovements. <br />AL. Prepared questionnaire to be used by sales personnel for gathering all <br />necessary design information to be used by engineers doing design. <br />11. TOR h RS OF PRODTTrTfi ngirn pw <br />A. Seminar on history of floating dock systems and overview of what is <br />currently available. <br />B. Destructive analysis of present flotation isiit centering it with ethers <br />on the market and recomnending ways to develop a better unit for <br />government acceptance. <br />C. Analysis of present flotation unit with suggestions for uoqrading along <br />with market analysis and suggestions for revision of literature and <br />advertising. <br />D. Analysis of potential for new synthetic deck material and presentation <br />on existing material. <br />E. Analysis of new float with suggestions on marketing. <br />F. Analysis of new power post design and reconmexidations on acceptable <br />warranty. <br />G. Testing of floats for shell thickness and foam absorbency. <br />H. Standard designs for wood structure private docks to use suppliers type <br />of flotation. <br />-6-