My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-1992 Council Packet
Orono
>
City Council
>
1992
>
08-10-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:23:50 PM
Creation date
4/8/2024 1:20:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a-'' ■f: <br />if'” <br />pi!’' <br />.V>(?!t'.' <br />;vVIf' <br />y' <br />/. *'ni <br />Ut;. ■■., <br />.t: <br />"'f <br />X. <br />•i.: <br />7. FOR OONDCMINIUM AND MARINA ASSOCIATIONS <br />A. Storm damage inspection of roofed floating docks with analysis of cause <br />for failure and suggestions for repair and upgrading. Then final plans <br />for i^rading of dock structure to provide adequate flotation .o carry <br />increased load requirements. <br />B. Analysis of sinking floating dock system with reccnmendations for <br />repair. <br />C. Analysis of dock failure due to ice movement with reccnmendations for <br />proper winterization to prevent future damage. <br />D. Anchorage analysis and reccnmendations for upgrading to handle todays <br />loadings. <br />E. Study of methods to raise freeboard on existing sinking dock system. <br />P. Design mooring system for boats xising slips against wall with major <br />water fluctuation. <br />G. Review of bid proposals and suhmittal drawings prior to award of <br />contract for additional docks at existing marina. <br />H. -Design^ pl2uis, specifications and contract si^ervisicn for replacement <br />of all flotation on a 200 slip Great Lakes existing homemade floating <br />dock system. <br />I. Analysis of recently installed dock system for relocation to provide <br />better and safer entrance and exit configuration. <br />J. Design of a barrier dock to prevent damage frcm "out of control” boats. <br />8. FOR OCXINTIES. CITIES AND CITY PARKS DEPARIMEJTTS <br />A. Layout and design of landing system for coimercial tour boats. <br />B. Design of floating dock system for transient boats up to 40' long at <br />riverfront park, writing of specifications, analysis of bids and <br />inspection service. <br />C. Design az)d specifications for replacement of existing docks and new <br />dinghy launch docks. <br />D. Layout, plans, specifications, si±ndttal review, manxifacturing <br />inspection and installation inspection for 130 slip floating dock <br />system to replace old deteriorated docks and coordination of utility <br />systems on docks. <br />E. Analysis of cause of failure of present floating docks with <br />reccnmendations for strengthening to increase life and reduce yearly <br />maintenance. <br />F. Design for expansion of boat launch area, boating school and launch <br />ranp pavemait repair. <br />G. i...Jign, specify, review submittals and inspection of new floating dock <br />system to replace old docks in erusting marina basin. <br />H. Engineering analysis of bids and submittals for new inland lake <br />floating dock system. <br />I. Analysis of cause of instability and loss of freeboard in existing dock <br />systems with reconinendatians for correction. <br />J. Inspection of existing dock system to recommend maintenance required <br />and to advise floating dock manufacturer or work reqxiired under <br />warranty. <br />K. Coordination of plans and specifications for launch ranp docks. <br />-4-
The URL can be used to link to this page
Your browser does not support the video tag.