Laserfiche WebLink
<" .• <br />*'l <br />t'-- <br />ill:' <br />hK <br />( « <br />hr ■'• <br />f'- ■ <br />"jr-. <br />■Sw*:. <br />rft'-' <br />tov-' <br />>W-. •.•. <br />1^'^- <br />:t • <br />^■:- <br />(4) Review of sulsnittal drawings and specifications <br />(5) In plant inspection of docks prior to shipment <br />D. Buying an existing dock facility to be part of a new condominium <br />development. <br />(1) Ccnditicn report for existing fixed pier system <br />(2) Specifications for upgrading existing dock syster. <br />(3) Study of available de-icing systems <br />E. For a marina addition to existing condcminiums <br />(1) Layout of docks to get maximtm nxxnber of slips <br />(2) Guideline specifications and request for quotation <br />(3) Engineering analysis of bids <br />(4) Assistance in writing of purchases contract and warranty <br />(5) Review of submittal drawings <br />(6) Inspection for contract conpllance <br />F. At a new marina complex <br />(1) Bigineering analysis of bids <br />(2) Assistance in writing of purchase contract and warranty <br />(3) Review of submittal drawings and specifications <br />(4) Inspection service <br />G. Prior to purchase of land for development <br />(1) Land tase study for maximum income involving size and location for <br />Condominiixns, Marina, Rack Storage, Boat Sales and Repair Area. <br />H. At a new condcminiun and boat basin project <br />(1) Review of proposed floating dock layout and calculating of selling <br />price per slip as designed and charges per boat slip with bigger <br />boats and variable mix. <br />I. For j; wit^rside development at an old shipyard <br />(1) Ttur i a Landscape Architect, the development of a 450 boat <br />waterf.ont marina 2is ^rt of a comnercial/condaminixxn development. <br />La>iv.., plans, specifications, bid analysis and construction <br />inspection for floating docks and 260 unit rack storage facility. <br />Also, coordination of all marina oriented landside facilities. <br />J. For a large development of expensive homes. <br />(1) Thru a marina developer and operator, the layout of slips for the <br />tot ’ water area .-.tth systematic arrangernent for phase <br />construction. <br />K. Preliminary layouts of slips for a Lake Erie marina prior to purchase <br />of land. <br />L. Design and specify, analyze bids, write contract, review submittals and <br />inspect installation for new marina project cn the Ohio River. <br />M. Bid analysis for 96 slip adjiistable pier marina. <br />N. Preliminazy studies for wave and ice problems and solutions for exposed <br />Lake Erie marina development. <br />O. Study of a half built new marina for analysis of work yet to be <br />conpleted to become operable, prior to possible purchase. <br />P. Design, specifications and solicitation of bids for new launch ramp <br />dock at existing Ohio River Marina. <br />Q. Analysis of debris problem at Mississippi River Marina and report <br />reccmnending new debris deflector with design requirements for <br />implementing construction.