My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-1992 Council Packet
Orono
>
City Council
>
1992
>
08-10-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:23:50 PM
Creation date
4/8/2024 1:20:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■•i'prm-'i‘"^M 1^: <br />I'f?w <br />& <br />3p'-!i, <br />r^j ■','.H'- . U'y^-.SfSftV' <br />ift.: <br />0y^:- <br />fe’fe; <br />^-V <br />|'-|«s- <br />M: ‘?h.::' <br />P#W' <br />%<.. <br />S|?K'‘ifif -■.'•••■ <br /><rv. <br />ife l»- <br />|;*v • <br />if <br />To:Mayor Peterson and City Council <br />Ron Moorse# City Administrator <br />Jeaniie A. Mabusth, Building 6 Zoning Administrator <br />Date:August 6, 1992 <br />Subjects City Facilities - Public Works Building <br />At the recent budget workshop, a statement was made <br />regarding the Building Department's delaying the progress of the <br />Public Works building because of the need to install the p->ved <br />floor before the building could be occupied. It is unfortunate <br />that members of the City staff were still being advised by either <br />the architect or representatives of Kraus-Anderson that this was <br />even an option, since the structural design of the Butler <br />building calls for first the pouring of the cement floor to <br />sustain the primary support structure for the roof. The delay <br />now appears to be that the roofing contractors have net returned <br />to the site to complete the roof. This should be follo^-red up on. <br />There is no question that the Building staff would have <br />disputed any move into this type of structure if the building was <br />completed and the floor not installed. The issues must be <br />obvious to the Council: <br />Potential ground contamination from motor vehicles <br />stored and maintained in building. <br />Potential liabilities to City and damage to structure <br />because exhaust and heating systems would not have been <br />installed (potential health hazard for occupants of <br />building). <br />Required plumbing would not have been available. <br />As we now progress with the construction of the <br />administrative complex, it may be helpful if members of the <br />Council contact the department directly when questionable issues <br />or similar concerns arise. <br />Isv <br />’■''r
The URL can be used to link to this page
Your browser does not support the video tag.