My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-1992 Council Packet
Orono
>
City Council
>
1992
>
06-22-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2024 10:38:22 AM
Creation date
4/1/2024 10:35:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING <br />HELD JUNE 8, 1992 <br />‘ i <br />U:. <br />:l,'fee- <br />ia <br />5 L <br />X%'V- <br />u <br />^ '■ ‘ f-.. <br />Jr' <br />]• <br />:,.f- <br />ifa <br />t.' <br />#j: <br />(•13) PREPARATION OF PLANE. AND SPECIFICATIONS FOR RECONSTRUCTION <br />OF LEAF STREET - RESOLUTION #3132 <br />Moorse explained this is a request for authorization from the <br />Counci I to move ahead in the preparation of plans and <br />specifications for reconstruction of Leaf Street. <br />Cook explained that the portion of Leaf Street reconstruction will <br />be removed from the sewer bid and constructed with MSA funds. He <br />noted they are looking at a couple of options, an urban/rjral <br />section or a total rural section. The street would be <br />approximately 32’ when finished. <br />Butler asked how wide the road is currently. <br />Cook said It is 21-22’, with the shoulder areas in lieu of curb and <br />gutter. He noted the shouIder-to-shouIder width of the road Is <br />26*. He added the reconstruction would involve Leaf Street from <br />County Road 84 to Watertown Road. <br />Butler reported that MSA funds can only be used if the road <br />connects to another MSA street or State Highway. <br />Cook noted that the sewer construction will impact the vegetation <br />In the area more than the street reconstruction. <br />Jabbour asked the width of the existing right-of-way. <br />Cook said the right-of-way is 66’ wide. <br />Jabbour stated that no one wants to encourage the widening of a <br />roadway. He asked Cook what the residents in the area would be <br />saving by using MSA funds. <br />Cook explained there is an approximate $100,00 difference. He <br />noted the road constructed to MSA standards would cost more because <br />of the additional amenities. He indicated that the City could <br />apply for a variance to the road standards that would allow <br />construction at a 28’ width. <br />Butler felt they should apply for the variance. She asked if they <br />would be able to box the sewer construction to stay within the <br />rIght-of-way. <br />Cook noted they would be using this method as often as possible. <br />Qoetten said she assumed this project would be done in a timely <br />manner. <br />8 <br />V'.,- \
The URL can be used to link to this page
Your browser does not support the video tag.