My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-1992 Council Minutes2
Orono
>
City Council
>
1992
>
06-08-1992 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:30:42 AM
Creation date
3/29/2024 11:27:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE CONTINUATION OF THE STUBBS BAY ASSESSMENT HEARING <br />HELD BY THE ORONO COUNCIL ON <br />HELD MAY 18, 1992 <br />Callahan felt that It could easily happen that a future ner would <br />be unaware of the required hookup charge. <br />Barrett stated that Information would not have Iw be legally <br />disclosed. He indicated that the only way to ensure the future <br />owner was Informed would be to file a document against the chain <br />of title, however on torrens prooerty that would be very difficult. <br />He explained that future property owners would be subject to the <br />City ordinances in effect at that time. <br />Butler reviewed a memo by Gaffron entitled, "Extended period for <br />sewer connect ion", whereby the foI Iowing conditions were suggested: <br />1. All failing systems shall connect to the sewer <br />immediately upon the availability of the sewer. <br />2. All systems determined to be non-conforming, <br />including those too near the water table and/or less than <br />75’ from the creek or lake and/or less than 50’ from a <br />well shall connect to the sewer within 16 months of Its <br />avallabiIity. <br />3. Any conforming functioning system constructed before <br />1/1/78 shall connect to the sewer witr.»' 16 months of Its <br />availability. Such systems will hav^ m useful service <br />life of 16 years or more. <br />4. Any conforming system constructed between 1/1/78 and 1/1/88 <br />shall connect within 36 months of sewer availability or by <br />1/1/96, thus ensuring that such systems shall have had a <br />useful service Iife of botween 8 and 17 years. <br />5. Any conforming system constructed after 1/1/88 shall <br />connect within 60 months of the date of availability or by <br />1/1/98, thus allowing a minimum of 6 years and up to 10 years <br />of useful service life for those systems. <br />6. Regardless of the above allowances, the sewer must be <br />connected upon any sale of the property served with sewer. <br />7. All properties regardless of connection status, start <br />paying the quarterly sewor charge at the end of the 16 month <br />standard connection period. <br />Ghaw asked if he has a double mound septic system, but is currently <br />only using one of those, would he be allowed to switch to use the <br />remaining one before required to hookup.
The URL can be used to link to this page
Your browser does not support the video tag.