My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-26-1992 Council Packet
Orono
>
City Council
>
1992
>
05-26-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 12:53:30 PM
Creation date
3/22/2024 12:50:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1/ <br />i <br />MINUTES OF THE STUBBS BAY ASSESSMENT HEARING <br />HELD BY THE ORONO COUNCIL ON <br />HELD MAY 4, 1992 <br />Qaffron explained that discussions on sewer installation for the <br />area Initiated In 1974. The 1980 Comprehensive Plan identified <br />five areas within the City to be studied for possible sewer- <br />install at I on. Four of those five areas have been sewered and <br />Stubbs Bay is the fifth area. He noted that in 1988 ari AI ternat i ve <br />Waste Management Study was done for the area, which did not Include <br />Oxford Road, Cygnet Place and Leaf Street. Since that time t e <br />project has been expanded to include those areas due to the <br />proximity to the creek or the lake, the small lot sizes and the <br />potential problem due to a lack of an a Iternative septic site, in <br />1989 the PCA updated their septic system regulations, Including a <br />redefinition of what Is a non-conforming system, which definition <br />Includes systems that do not have a three foot vertical separation <br />above zones of soi I mottiing or other Indicators of a seasonal <br />water table. The DNR has mandated that cities with significant <br />lakes and streams adopt shore I and regulations which <br />development near shore I and and mandated the adoption of the PCA s <br />septic regulations. Gaffron reviewed that staff has analyzed a <br />number of factors of the area and established a classification <br />system. He stated that 18 of 127 existing homes have falling or <br />non-conforming systems and 78 homes probably do not have an <br />alternate septic site. He noted that based on their data, nearly <br />all alternative sites would require a mound-type septic system. <br />He stated that homes without an alternative site, would have to <br />Install a holding tank If their system failed. Gaffron said that <br />municipal sewer will elImlnate existing septic problems and provide <br />a cost-effective alternative to holding tanks. <br />Cook explained the project design. He stated that the project is <br />expected to take approximately four months to complete, and if <br />do not encounter any problems with obtaining the required <br />easementc, the entire project could be completed by September 1992. <br />Moorse explained that staff worked with a number of assessment <br />experts to determine benefits to the properties which are reflected <br />In the assessment cost. He noted that to keep the cost down, <br />formal Individual appraisals were not dona in the area. He <br />indicated that some factors that quantified benefits included: <br />1. Cost of sewer vs. holding tank. It was determined that <br />a 15 year period, a holding tank would cost two to three times the <br />cost of the sewer assessment. <br />2. There are a number of properties in the area that have systems <br />that are expected to have a short life span and would neea to be <br />upgraded.
The URL can be used to link to this page
Your browser does not support the video tag.