My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-26-1992 Council Packet
Orono
>
City Council
>
1992
>
05-26-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 12:53:30 PM
Creation date
3/22/2024 12:50:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F'-' " ■■■ ■ ■■ ■'■te^'4 ■• ■‘L. - <br />i <br />>* <br />iii.wV/'^';’' , <br />^4Vf’ -V <br />''iH <br />■ if "n' <br />■< ■ .. <br />irki^;4 A <br />t <br />1^''[ <br />^wm. <br />l?«fi <br />Approved by the Board of Education - April 13t 1992 <br />High school <br />- S«al coat front parting lot and driveway <br />- Repair tennis court fencing <br />- Re^ir shop addition roof edge <br />I R!Sount ‘’g*as8*bSs)cetball backboards <br />- Repair/replace sidewalk from Music area <br />. Repair lockers as needed <br />- Repair mezzanine tile <br />Middle School <br />- Add fire sprinkler system , i «.,nv- Repove and replace underground fuel oil tank <br />- Roof repair- Repair bleachers as needed <br />Schumann Elementary <br />Add fire sprinkler system <br />Roof repairKS!5'«'SS “as. 1.». <br />Link <br />. Sidewalk and landscape west of building and possible parking <br />Orono Primary <br />Provide more parking space on east side of building <br />Taper blacktop by north exit to playground <br />Pepeir or replace condensate tank in boiler room <br />Provide 2 additional window air conditioners in office area <br />Repair/replace window screens <br />Pill along building with black dirt and sod <br />Carpet and paint Chapter I room <br />District wide <br />- Painting projects at all locations <br />- Inventory items in storage areas <br />- Repair/replace carpet as part of normal replacement cycle A <br />i <br />There are hundreds of other repair/improvement jobs that will be <br />completed by our custodial crews which do not have significant cos* <br />impact. These projects will be done as a matter of course. <br />The administration is asking approval at this time so we can plan <br />for these projects this summer. <br />'.iMZ-ri-i i-. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.