My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1992 Council Packet
Orono
>
City Council
>
1992
>
04-13-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:27:16 AM
Creation date
3/12/2024 10:23:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■r<ik <br />3*:-' <br />.V <br />;"t. <br />,v <br />■'5-. <br />i^iv, <br />%Kr <br />ih <br />?.f.V. , ■ <br />1^ <br />r'r <br />PK <br />¥'f- <br />P"K' : <br />shall be constructed, altered, J’gY'^^by'^^the* Shadowoodof the property «"thout written approv^_^^b^^ <br />Architectural Control ^ including site location <br />?hereo^f?^nd“ortL bu^irer who^will actually perform the proposed <br />work. <br />C „ a -j ComDOsition of Committee. The Committee shaM <br />sSali®be°appointed"brDeveio^ «h^ch"," the" CoXttee shall be <br />appointed by the Board. <br />^ -5 «rt«s - Duorum The Committee shall appointSection 4.3. Meeting , Q • (.^airman. The Chairman shall <br />one member of the A quorum of the Committee shall <br />call meetings of the Committee. (-onmittee may act upon the vote <br />oni«rprovarand“s!:tla? !nstruments effectuating decisions of the <br />Committee. <br />section 4.4. Submission of ^'^seive' three <br />before construction is ®°r>fspecifications (the <br />(3) complete sets of "%uu% plans, exterior <br />-Plans"), including, Y^r^J^^^drivewav plak, and landscape plan, along <br />materials, exterior colors, „iii actually perform the proposedwith the name of the '.ho wiU ^ 3^3^ <br />such* Plans^^shaU ^e'^^'^bmitted injaj^^^ °^55402!^°^t%e?Lr °^wfth <br />p^^cessinTfee of$50.'o0° ' Thereafter, the Plans shall be submitted <br />as required by the Committee. <br />1 nP ntiild<>r and Plans. Within thirty <br />Section 4.5. Approval ® the name of the builder, and the <br />(30) days of receipt of the Plans, party submitting the <br />processing fee, ^^^^iggpp^oval The^ Committee may disapprove a <br />same of its in its sole discretion, that <br />builder if the Committee , .i-andards The Committee <br />such builder does not -®t^-=h® ?be intended <br />?S^rovemlStT?re 'not Tu^^fble for the Property or for one or more <br />of but not limited to, the following reasons: <br />(a) noncompliance with the Declaration; <br />sdni0 Q0n0r3l sxz0r ^ ^ 1^^ PrnD^rtvrthe dwellings built or to be buiU un the Prop- y. <br />(C) failure of a J„ttible'°tof he"'dwl?lingsoriented on its Lot in a manner compatible
The URL can be used to link to this page
Your browser does not support the video tag.