My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1992 Council Packet
Orono
>
City Council
>
1992
>
04-13-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:27:16 AM
Creation date
3/12/2024 10:23:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;? ,■ <br />fi- - <br />"^•'r <br />Sii!fets <br />m <br />i'» <br />KSa, <br />'.■:r-1rt- . <br />.. •■ s v: <br />il' <br />^T'c-fe- <br />i^i- <br />»y;.^ / . <br />TM''- <br />v5W-. <br />#v <br />!Mi <br />/>/■- <br />m:?::>X <br />J'-i|?:A;„ <br />r^\--:: <br />:sfM' <br />^^'v <br />'T/, <br />' i- * ■• *- <br />fe, <br />5. <br />6. <br />7. <br />8. <br />the schedule of hauling activities so th'it staff can arrange <br />for the necessary inspections. Prior to hauling any fill to <br />the site, the applicant must arrange f»jr a pre-construction <br />meeting with the Orono staff to review all final submittals <br />and tentative hauling schedule. The City will ask that a <br />representative of its Police Departuent be present at the <br />pre-construction meeting to advise of any special <br />traffic/safety concerns during the hailing process. <br />Hauling activities shall not be conducted during the <br />following time periods: <br />6:30 a.m. to 8:30 a.m. <br />4:00 p.m. to 6:00 p.m. <br />The applicant shall cease all hauling to the site upon <br />evidence of shearing and/or other signs of instability <br />created by filling over the former dump site. Applicant <br />shall not proceed with hauling until the City Engineer has <br />had adequate time to review the evidence and submit a <br />written report to the Council for their review and action. <br />If Council determines that it is in the public interest to <br />cease all hauling to the site, this conditional use permit <br />shall be terminated immediately and the applicant shall <br />complete the final grading and seeding of the entire <br />disturbed area. <br />Applicant is responsible for up-dating all previous permits <br />issued by the Department of Natural Resources, Minnesota <br />Pollution Control Agency, Hennepin County Department of <br />Environment and Engineering, and M.C.W.D. before the Orono <br />staff can issue a land alteration permit. <br />Authorities granted by this resolution run with the property <br />net with the owner, but are permissive only and the filling <br />of the site must commence within one year of the date of <br />Council's approval (April 13, 1993). The land alteration <br />permit shall be valid for a two year period. The land <br />alteration permit shall be written to specify the specific <br />time restrictions on this permit. <br />Page 4 of 6
The URL can be used to link to this page
Your browser does not support the video tag.