Laserfiche WebLink
W"jl^rovided .d rincipai°^s^*-ructur^e^Vetbacfk ^and must be <br />|lXl of the following standards are met: <br />£ 1 Proposed conversions must be initially <br />•valuated using the 'same procedures for of ?he <br />2. Deficiencies involving water supply and <br />°pr\ iriV. con.^rAi: <br />hr as specified in the conditional use permx^. <br />3. Shore setback zone and bluff impact zone <br />ieficiencies must be evaluated and reasonable <br />IS part of the conversion. These improvements cus.. .nc^u e <br />Ippiicahle the following: <br />lOCkSp w«-a*us* -----------^---V” .--------J.shore setback zone or blufr impact zone. <br />a. Removal of extraneous buildings, <br />, or other facilitie^s that no longer need to be locatec in <br />b. Remedial measures to correct erosion <br />tites and improve vegetative cover and screening of buildings ana <br />jther facilities as viewed from the water. <br />(2, If existing dwelling units are <br />_j ij, the shore setback zone or bluff impact zone, conditio <br />Sail be attached ?o approvals of conversions that preclu^ <br />he cikditiona must also pMvide for future relocation ^w^l^ing <br />nltsT where feasible, to other locations, meeting all s tbacR ana <br />IteUtioS %quirements when they are rebuilt or replaced. <br />Bring the conversion to limit impacts <br />equiring seasonal use, improving no new sewageentraliziag shore recreation facilities. Installing new sewage <br />reataent ayaternsr or other means. <br />Subd. 20. Riparian Access and Rights For <br />U.ch as a result of the designation of the OHWL are fo^d to ^ut <br />St bo^dary of a lake, stream, or tributary, no section this <br />>de s^ll be construed as obligating the City of Orono to approve <br />26 <br />m % i <br />% • • <br />.1 • <br />S..S