My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1992 Council Packet
Orono
>
City Council
>
1992
>
04-13-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:27:16 AM
Creation date
3/12/2024 10:23:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
k'.f <br />‘V . <br />'I-> ' <br />f- <br />[j' <br />i*’fi. <br />Zoning File #1721 <br />March 12, ^992 <br />Page 2 <br />List of Bxhibiiis <br />A - ^pplication <br />B - Property Owners List <br />C - Plat Map <br />• D-1-4 - Hardcover Fact Sheets <br />'• E - Hardcover Map <br />F - Weckman Memo 3/12/92 <br />G - Cook Report 3/6/92 <br />H - Section - Culvert Under rakota Rail <br />I - Gronberg Report 3/9/92 <br />J - Baffle Weir resign <br />K - DNR - Protected Waters Map <br />L - Watershed Map (Tanager r,ake/Brc ^ns Bay) <br />M - Road Profile <br />N - Road Section <br />0 - Road Plan (Urban 'ection) <br />P “ Shoreland Regulations/Shoreland Overlay Map <br />Q “ Preliminary Plan <br />Brief Description of Application <br />The applicant proposes the division of his 29.14 acre <br />homestead property into 5 lakeshore residential lots. All lots <br />shall be served by a private road. Each proposed new residence lot <br />will be served by an on-site septic and well. Based on the new <br />shoreland regulations, the existing guest house does not meet <br />required 100' setback from the 929,4 or OHWL (Ordinary High Water <br />Level) of Tanager Lake and is considerr?d a non-conforming <br />structure. Additional septic testing has been submitted for the <br />guest house. <br />Upon a site inspection of the property and additional <br />information rrom caretaker, it appears the existing soptic system <br />is located to the south sid^ of the guest house and may encroach <br />the required 75' setback from the OHW of Tanage - Lake. Applicant <br />has option to either confii... existing location of system or install <br />a new system within 1 year of final plat approval (per Section <br />12.30, Subdivision 5 (C), If applicant plans to install a new <br />system, additional septic testing must be provided for another <br />alternate septic site. If feasible, guest house may be served by <br />existing system that serves principal structure. Applicant must <br />decide how this matter is to bo resolved. <br />Each lot meets the required 2-acre dry contiguous standard. <br />The southern wetlands are par* of the Tanager Lake watershed and <br />are now classified as parr of Tanager Lake based on the location of <br />929.4. Refer to your preliminary plan, Exhibit Q. The wetlands to <br />the north and east are part of the Browns Bay watershed. All <br />setbacks shall be measured from the agreed upon OFWL of the wetland <br />(932.3). The wetland within Lot 1 located between the driveways on <br />jOt 1 is not a designated wetland nor is the low retention area
The URL can be used to link to this page
Your browser does not support the video tag.