Laserfiche WebLink
«S3<- <br />?Yv;v' <br />M;> •'- >% , <br />■•'■.I . ■ <br />'■f”S' . <br />:^::k:;:-tei- <br />>l.;v, .^. <br />. JzF^^ ,z <br />is. ■•- <br />.#W,I <br />SYSTEM DESIGN FOR MLR CONSTRUCTION <br />McCLOUD RESIDENCE <br />in the SE 1/4 of SECTION 31-118-23 <br />ORONO, MINNESOTA <br />10-9-90 <br />Additional information follows for the installation of a <br />pressure mound system. In addition to those requirements, two <br />septic tanks of 2000 gallon capacity each are recomme..ded along <br />with a 1000 gallon pumping tank. ^ ^ <br />All construction traffic must be kept off both the primary <br />and the alternate septic sites. Grading must be done to divert <br />some small drainageways around the mound area and _o keep othe- <br />runoff water away. All construction and moterials must aahere <br />to the provisions of the City of Oronc. <br />If any other information is needed, please contact me. <br />Sincerely, <br />PERCOR, INC.^ <br />■ - <br />Mark S. Gronberg, <br />PCA certified