My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-23-1992 Council Packet
Orono
>
City Council
>
1992
>
03-23-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2024 9:19:43 AM
Creation date
3/11/2024 9:16:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
^ 7iJL>•. a <br />!1 J <br />i <br />i <br />* • <br />i;iiill <br />T:'<GREENHOUSE PLAtlS <br />p.Dimensions: 14' wide by 100' long by 10' high. <br />Structural design: <br />■ . <br />.,»r <br />sp«'.rHeat source: <br />Standard 22' long iV arched steel tubing on 4’ centers. <br />52 stakes anchored 2k* in the ground with 3 per Ions <br />(horizontal ties) for support. Exterior is a 6nm poly <br />tacked to the wooden perIons on either side. <br />Jte-, <br />■ r.'.i <br />Electricity: <br />ESm^ : <br />A 125,000 BIU forced air furnace, fueled \^^Lth propane. A temp <br />orary 500 gallon tank is delivered by a local propane company. <br />All state and local codes are observed in placing the the tank <br />the proper distance from the strticture and using the proper <br />size copper tubing for the fuel hook up. <br />Used for the fan on the forced air furnace. A standard 14/2 <br />wire is run from the closest outlet. <br />used: The greenhouse will be needed from tlarch 15, 1992 to June 15, 1992 <br />r-i <br />at wliich time it will be taken down. <br />i*: <br />T. ■ <br />HI <br />■ V- <br />WM <br />■;-i, v%'. <br />tplp ■siiif- <br />‘ <br />1 <br />. 4 <br />i <br />I <br />'* i <br />r' ■: <br />■v!
The URL can be used to link to this page
Your browser does not support the video tag.