My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
03-11-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:00:21 AM
Creation date
3/8/2024 1:03:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 City of Orono March 7, 2024 Attn: Josh Lemons RE: Exterior Service Door/ Interior Window Scope of Work: Sawcut and demo, window, cmu and brick to allow for new door, frame and transom. Remove gyp, ceiling grid, tile, sawcut and remove cmu to allow for new HM window frame. Install and remove shoring at new window at office as necessary. Install temp enclosure at new exterior opening, floor at office, dust enclosure at office. Install new exterior HM frame with transom glass above approx., 4’-0 wide x143” tall. Frame to be spray foamed, jambs block grouted, anchored and Bondo anchors. Install break metal at interior jambs of new exterior frame to cover cut cmu. Install new 5’-8”w x 4’-0 tall HM window at interior office to shop. Install W8 Lintel at interior window with soap block above new window. Patch and return jambs with sheetrock taped and sanded at interior window. Reinstall ceiling grid and tile at new lintel location at office. Install sealant at new exterior door, and interior window frame. Paint all HM frames at exterior door and interior window. Paint office wall to wall at sheetrock at new window, exterior to remain grey block. Excavation and backfill for one stoop foundation and sidewalk base preparation. 5’x5’ stoop to include footings, foundation wall (48” high) and an isolated stoop slab. 5’x12’ exterior walk, 5” thick no additional reinforcement. Remove and replace approx. 12 L.F. of curb for new pedestrian ramp entrance. (This can only be achieved if existing grades allow, no detectable warning plates or asphalt patching figured.) Interior masonry window opening (5’-8”x4’ high) to include supplying and setting one 7’ +/- lintel, grouting existing jambs and installing lintel block at the head of window. INCLUDES: Labor, Equipment, Disposal, Materials and Tax. EXCLUDES: Permits/City Requests Testing/Soil Corrections Private Locates Landscaping/Sod or Seed Relocation of water line Total Proposal….……………………………………………………..………………………..................$57,475 Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. City of Orono Representative Date Ebert Construction Date 229
The URL can be used to link to this page
Your browser does not support the video tag.