My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1992 Council Packet
Orono
>
City Council
>
1992
>
03-09-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 2:04:56 PM
Creation date
3/5/2024 2:02:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p’ <br />T 'f <br />r <br />fci; •-: ^ <br />.. <br />MINUTES OF THE ORONO PLANNING COMMISSION MEETING <br />HELD FEBRUARY 18, 1992 <br />ZONING FILE #1715 - CONT. <br />Bellows felt these additional corrections being brought up at this <br />time were Inexcusable and noted that Boarman should be questioned <br />regarding this matter. <br />Mabusth noted that It was staff’s understanding that there would <br />be less soli corrective work for this site than would be required <br />for property at the southwest quadrant of Highway 12 and Old <br />Crystal Bay Road North. <br />Be I Iows reminded them that the soil borings for this site were not <br />submitted until the bids went out. <br />Callahan corrected her, noting that borings were done a long time <br />ago, but during a dry season. <br />Mabusth noted that there had been some concern on the part of the <br />City Engineer dealing with the degree of slope from the Public <br />Works building to the street. <br />Bellows asked who the civil engineer for the project Is. <br />Mabusth stated that Mark Gronberg is doing all preparation for the <br />watershed permit, and noted that she could not provide a name of <br />the persons responsible for civil engineering matters involving <br />CI ty faciI 11ibs. <br />Bellows askeu who was doing the grading plans. <br />Mabusth hoped they were fo' lowing the plan submitted by Mark <br />Gronberg. <br />Bellows .elt they should get together Krause Anderson and Boarman <br />to review all these issues. <br />Mabusth noted the next FaciIities Committee meeting was scheduled <br />in two weeks. <br />Callahan felt that In two weeks it would be too late, and it was <br />his understanding that Boarman felt the meeting held today was <br />needed to get the specs together, which wasn’t done. <br />t#7) REPORT BY PLANNING COMMISSION REPRESENTATIVE TO COUNCIL <br />MEETING HELD FEBRUARY 10, 1992 <br />Bellows attended and had no comment.
The URL can be used to link to this page
Your browser does not support the video tag.