My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-1992 Council Packet
Orono
>
City Council
>
1992
>
02-24-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2024 2:58:52 PM
Creation date
3/4/2024 2:56:03 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-•^ .1iv . <br />ii <br />j*;*' m~,.' <br />iSe. <br />S^?i!'i=W= <br />i»-W • si "t,' *- <br />.'•V^ <br />> <br />?'■■■•,■. <br />?i, ■ <br />K^’: <br />P-m. <br />1. <br />2. <br />3. <br />4. <br />Hardcover in the 75-250' zone is approved at a level of <br />50.6%. All existing and proposed hardcover approved <br />with this variance approval is recorded in the <br />calculation worksheet and diagram enclosed with the <br />resolution as Page 6. The current property owner and <br />all future owners of the property are placed on notice <br />that hardcover shall not be increased above the <br />currently approved level, and any proposed improvements <br />over the property that would result in additional <br />hardcover in either the 0-75' or 75-250' zone must be <br />approved by the City. Such approval may result in <br />requirement for concurrent equivalent or greater <br />removals of existing hardcover. Any existing hardcover <br />not shown on the approved hardcover diagram and <br />calculation worksheet shall be removed no later than <br />June 1, 1992. <br />The garage shall be reconstructed to meet the required <br />10' west side setback. The west and south walls of <br />said garage shall then be retrofitted with proper slab <br />reinforcements subject to review and approval by the <br />Building Inspector. Further, if the garage is <br />reconstructed such that the roof li* e continues to <br />discharge in a westerly direction, applicant shall <br />provide a roof gutter system to direct such drainage to <br />the nortli of the garage, away from the remaining <br />portions of slab adjacent to the west and south lot <br />lines. <br />Prior to commencement of reconstruction or completion <br />of the garage- applicant shall provide the building <br />inspectoi with suitable construction plans conform: -'"j <br />to the conditions of this resolution, and shall obtain <br />the appropriate permit for such construction. In <br />addition to the nornnal building permit fee, applicant <br />shall pay the after-the-fact investigation fee for the <br />building permit because construction was commenced <br />prior to issuance of the building permit. <br />Applicant shall pay the aft€r-the-fact investigation <br />fee for the zoning application because construction was <br />commenced without the proper variance approvals being <br />obtained. <br />Page 5 of 9
The URL can be used to link to this page
Your browser does not support the video tag.