My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1992 Council Packet
Orono
>
City Council
>
1992
>
01-27-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 4:03:17 PM
Creation date
2/26/2024 3:59:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />CITY OF ORONO <br />UPGRADE OPTIONS CITY HALLff>OLICE <br />Boarman Kroos Pfister & Associates <br />January 14,1992 <br />om4\b\8-itbi <br />T., (ouowlns l..m, represent upgrades to the current estimate and would he <br />____•^teiaa.athA Tost flstimates indicated previously. <br />lOrwy macnanwii ■ weiw; <br />---------------------------------■ ' Ic <br />[alternate ITfcM_________________________ <br />:osT /APPROVAL <br />fl^ Add for rttainlng walls at public works building. <br />2 Add ^ta fences at public works building. <br />Fen« would be located at the east side of the site <br />and would be used to control access to the yard. <br />$29,700 <br />$10,632 <br />a Add stone belt course at public works building. <br />8 Inch high stone band around building. Base bid is <br />1 accent color brick. <br />$7,980 <br />4 Add for modular brick at public works building. <br />use modular brick In lieu of saxon brick above base. <br />$9,750 <br />S Add for stone bend at dty hall/pollce. <br />8 inch high stone band at 2‘-9' around building. <br />Biff bid is accent color brick. <br />$32,020 <br />8 Add for modular brick at city hall/police. <br />Use modular brick In lieu of saxon brick above base. <br />7 Add for hot water heating system. <br />Hot water radiant heating system in lieu of forced <br />air system. <br />1 TWs rtevalor would be required for the ADA <br />eccessB)iiity requirements if there would be storage <br />on the second floor, (see Item #10) <br />$6,500 <br />$51,500 <br />$28,000 <br />L. Add for operable windows In lieu of fixed. <br />buMkig. w any storage Is provided, accessibility <br />wfli be required via elevator per ADA. <br />$3,250 <br />$16,000
The URL can be used to link to this page
Your browser does not support the video tag.