My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1992 Council Packet
Orono
>
City Council
>
1992
>
01-27-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 4:03:17 PM
Creation date
2/26/2024 3:59:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Carman Street Project (private) - 1984 - lift station <br />and laterals ~ 3 residential units. <br />5. 1984 Fcrcemain and Lift Station 87 upgrade. <br />6. 1989 Lift Station #10 Bypass (in conjunction with <br />M.W.C.C. Project #85-67). <br />7. Lift Station #8 Upgrade - 1990. <br />B. ORONO SCHOOLS SYSTEM. This system was originally <br />constructed in 1967, with gravity discharge to the City of Long <br />La)ce lateral sewer system. The following upgrades and additions <br />have occurred* <br />1. Construction of the Medina/Orono interceptor, (1981) <br />included construction of a force main from the Medina <br />Morningside area of the City of Medina. This for cemain <br />discharges to the pre-existing Orono gravity lines in Old <br />Crystal Bay Road. <br />2. The Medina/Orono/Long La)ce bypass consisted of gravity <br />mains linking the original Orono gravity system directly to <br />maim, near the Long Lake pump station, bypassing the Long <br />Lake municipal lateral system to relieve capacity problems <br />created by Orono discharges. <br />3. Project #1989-1 included laterals, trunks and a lift <br />station/forcemain to serve existing and future development, <br />both residential and commercial, within the Highway 12 <br />corridor indentifled in City of Orono Comprehensive Plan <br />Amendment #2. This project also included construction of a <br />water system and well/pumphouse. <br />C. HACKBERRY HILL SYSTEM. No changes have occurred <br />during the period 1980-1990. <br />D. WAYZATA SYSTEM EXTENSIONS. No changes have <br />occurred to this system during the period 1980-1990. <br />E. CRYSTAL BAY SYSTEM (1985). This system consisted <br />of trunks and laterals to serve the Crystal Bay neighborhood, <br />approximately 85 residential units. Gravity laterals discharge <br />to an injector station at the inter.section of Spates Avenue and
The URL can be used to link to this page
Your browser does not support the video tag.