Laserfiche WebLink
25 <br />Inspect all of the City’s lift stations <br />annually and rehabilitate 2 per <br />year <br />Lift Stations rehabilitated 2 2 2 <br />Inspect all new Sewer Connection <br />for compliance with CEAM <br />standards <br />Number of sewer service <br />installation inspections <br />100% 57 52 <br />Reduce I&I though inspect and <br />require repairs to sanitary sewer <br />Services <br />Point of Sale Sewer <br />Inspection <br /> 79 74 <br />Issues Identified 25 21 <br />Correction made 20 17 <br />7.06.02 Key Activities. <br />The City’s Point of Sale Inspection Program, Public Works staff completed 74 Point of Sale inspections. Data from <br />this year indicated that 32% of lines inspected required some kind of repair. <br />7.07 Water System Operations. <br />The department’s goal is to provide safe and reliable drinking water that <br />meets federal and state water quality requirements. The municipal Water <br />system consists of 125,637.5 feet of water main, 4 wells, 2 water towers, 293 <br />hydrants, 362 valves serving 1159 customers. <br />7.07.01 By the Numbers (Metrics) <br />Strategy Measure Target 2022 2023 <br />Proactively maintain the <br />system through inspections <br />and exercising hydrants and <br />valves. <br />Number of water main breaks 0 4 5 <br />Hydrants flushed 293 325 107 <br />Valves exercised 308 412 3 <br />Water Services inspected All new 36 25 <br />Ensure wells, plants and <br />storage is reliable and <br />functioning efficiently <br />Gallons pumped As needed 156M 144M <br />Gallons of Unaccounted water <10% 9.9% <br /> <br /> <br /> <br />7.07.02 Key Activities. <br />The watermain Under the Coffee Bridge was replaced with new water main. This was as a result of a major break <br />that happened. <br />7.08 Services. <br />Coffee Water main <br /> <br />187