Laserfiche WebLink
23 <br />7.04.01 By the Numbers (Metrics). <br /> <br />Strategy Measure Target 2021 2022 2023 <br />Focus efforts and resources <br />on preventive maintenance in <br />order to maximize the <br />longevity of the pavement. <br />React to maintenance issues. <br />Average PCI Rating 80+ 79.9 78.5 80.7 <br />Ton of Asphalt used in Patching Decreasing <br />trend ↘ <br />74.5 73.1 52.65 <br />Feet of Crack Sealing 25000 31000 0 51,858 <br />Miles Overlaid 2.5 1.25 3.4 0.38 <br />Miles Reconstructed (includes <br />reclaims) <br />1 .65 .5 1.04 <br />Signs Inspected 100% of <br />Maintenance <br />District <br />269 315 479 <br />Execute City Street Sign Policy <br />to replace worn or damaged <br />guide, warning, & regulatory <br />signs. <br />Signs Replaced 60 62 21 95 <br />Signs Reduced As many as <br />possible <br />9 0 2 <br />Execute City and Ice Policy Number of Snow and Ice Events NA 13 17 42 <br /> <br />Reduce chlorides used <br />through adoption of snow and <br />Ice best practices <br />Tons of salt per mile per event 0.25 1.82 .26 .42 <br />Gallons of Brine Pretreat per <br />mile per event <br />50 10 10.2 34.9 <br /> <br /> <br />7.04.02 Key Activities. <br />Holiday decorations consisting of flags, banners and lighted decorations are put on our street lights to display <br />holiday cheer, show support to our community, and honor our veterans. <br />7.05 Stormwater Maintenance. <br />185