My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-26-1993 Council Minutes2
Orono
>
City Council
>
Minutes
>
1990-1999
>
1993
>
04-26-1993 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 9:51:39 AM
Creation date
2/23/2024 9:49:20 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF A REGULAR ORONO COUNCIL MEETING <br />HELD APRIL 12, 1993 <br />HENNEPIN COUNTY - NORTH ARM ACCESS - CONT. <br />It was moved by Hurr, seconded by Goetten, to authorize Hennepin <br />County to repair of the seawall in the existing footprint at North <br />Arm Access under the conditions of the original conditional use <br />permit as previously approved. <br />Mayor Callahan questioned her Interpretation to mean that, If <br />destroyed, any building could be reconstructed under an existing <br />conditional use permit. <br />Hurr felt if built In the same footprint that would be allowed. <br />Kelley disagreed and felt a new conditional use permit was needed. <br />Jabbour suggested they short-circuit the process due to the public <br />health, safety and welfare concerns. <br />Mayor Callahan stated it seems that the County engineer was aware <br />of the necessary repair, and that they did not feel it necessary <br />to obtain the City’s permission. <br />Mabusth noted the County has already filed for a conditional use <br />perm!t. <br />Vote: Ayes 2, nays 3. Mayor Callahan, Jabbour and Kelley voted nay. <br />Mot Ion falled. <br />It was moved by Mayor Callahan, seconded by Kelley, to allow <br />applicant to proceed with necessary repairs but require the filing <br />of the required conditional use permit before repairs begin. <br />Application would be reviewed at the May Planning Commission <br />meeting as an after-the-fact application. The County must submit <br />plans for Building staff and Engineer’s review prior to <br />Installation. A building permit will be required for the repair <br />work. Ayes 4, nays 1. Hurr voted nay. <br />Mayor Callahan recessed from 8:47 to 8:55 p.m. <br />(i13) INTERVIEW PLANNING COMMISSION APPLICANTS <br />Dale Lindquist. 780 North Brown Road, explained he has lived In <br />Orono 17 years and previously has not had the time to be active In <br />government and has recently sold his business Interests and now has <br />the time. He felt his past experience In the construction business <br />would be an asset. He noted he I s no longer on the Downtown <br />CouncII. <br />I <br />a
The URL can be used to link to this page
Your browser does not support the video tag.