My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-2024 Planning Commission Packet
Orono
>
Planning Commission
>
2024
>
02-20-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 12:34:52 PM
Creation date
2/21/2024 3:37:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(3) Holding tanks. Holding tanks may be used for the following applications only after it can be shown <br />conclusively by the property owner that a -an SSTS permitted under this article cannot be feasibly <br />installed: <br />a. As a replacement for an existing failing SSTS; <br />b. For an SSTS that poses an Imminent Threat to Public Health and Safety; or <br />c. For use with buildings with limited water use. <br />(4) Determination of hydraulic loading rate and SSTS sizing. <br />Table IX from Minn. R. 7080,2150, subp. 3(E) entitled "Loading Rates for Determining Bottom <br />Absorption Area and Absorption Ratios Using Detailed Soil Descriptions"" and <br />Table IXa from Minn. R. 7080.2150, subp. 3(E) entitled "Loading Rates for Determining Bottom <br />Absorption Area" Using Percolation Tests" and herein adopted by reference shall both be used to size <br />SSTS infiltration areas using the larger sizing factor of the two for SSTS design. <br />(Ord. No. 212 3rd series, § 1, 8-13-2018) <br />(Supp. No. 20, Update 2) <br />Page 2 of 2 <br />Created: 2022-07-19 16:12:42 [EST] <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.