My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-1993 Council Minutes2
Orono
>
City Council
>
1993
>
03-22-1993 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:59:35 PM
Creation date
2/16/2024 3:56:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
uHENNEPIN I I I^ i III t ^ »V^.I /Hopkins, Minnesota 55343-8468PHONF: (612)930-2600 <br />FAX (612)930-2513 <br />TDD: (612) 930-2696 <br />D f'eti: Tulkki I Bruce Polaczyk- ' Steve Theis <br />))ave Zotterstrc <br />'' Dave Swenson <br />Les Wei gelt (2) <br />March 16, 1993 <br />Jeanne Mabusth <br />Building & Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 56323-0066 <br />Dear Ms. Mabusth: <br />RE: Proposed Conditional Use Permit - Lu Ann Walters, Day Care Center <br />CSAH 6, Northeast quadrant of 7H 12 <br />Section 29, Township 118, Range 23 <br />Hennepin County No. 2047 <br />Review and Recommendations <br />We reviewed the above conditional use permit request and make the following <br />comments: <br />- For future improvements to this segment of CSAH 6 the developer should dedicate <br />any right of way required to make the right of way a minimum of 40 feet from the <br />center of CSAH 6. <br />- Moving the existing driveway from CSAH 6 further away from the TH 12 intersection <br />is acceptable to Hennepin County. The new access will require an approved <br />Hennepin County entrance permit before beginning any construction. Contact our <br />Permits Section for entrance permit forms. <br />- The existing driveway must be removed and-restored to Hennepin County standards. <br />- All proposed construction within County right of way requires an approved utility <br />permit prior to beginning construction. This includes, but is not limited to <br />driveway removal, drainage and utility construction, trail development and <br />landscaping. Contact our Permits Section at 930-2550 for utility permit forms. <br />- The developer must restore all areas disturbed during construction within County <br />right of way. <br />Please direct any response to Les Weigelt. <br />Sincerely, <br />Thomas 0. Jdhnson, P.E. <br />Transportation Planning Engineer <br />TDJ/L0W:lw <br />HENNEPIN COUNTY <br />on equal opportunity employer
The URL can be used to link to this page
Your browser does not support the video tag.