My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #281-3rd Ser/ 2023 Fee Schedule
Orono
>
Ordinances
>
Ord #281-3rd Ser/ 2023 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 10:30:53 AM
Creation date
2/16/2024 10:25:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEWER PROJECTS <br /> Connection to existing City Sewer System: $5 $ 5,800.00 <br /> Connection to City Sewer in areas still within their assessment window(less than 15 years since project was assessed) <br /> shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of the <br /> project: <br /> Fee <br /> 207 1- ., e S $12,775.00 $ - <br /> 2010 North Farm Road $21,270.00 $ 22,120.00 <br /> 2014 Green Trees $224410.00 $ 23,710.00 <br /> 2015 Green Trees Extension $21,775.00 $ 22,650.00 <br /> Connection to Sewer System in adjacent city <br /> Fee <br /> Connection to Long Lake Sewer System $1,900.00 or per current Long Lake <br /> Fee Schedule <br /> Connection to Wayzata Sewer System $1,000 or per current Wayzata Fee <br /> Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.