Laserfiche WebLink
Application <br />2022 Fee <br />Escrow <br />Notes <br />Demolition <br />Demolition: Principal structure <br />$100.00 <br />$1,000.00 <br />Demolition: Accessory structure/Septic system (Per <br />unit fee) <br />$50.00 <br />$1,000.00 <br />Based on Value <br />May require City Council <br />Retaining walls <br />Table <br />$1,000.00 <br />approval (Variance or CUP) <br />Plumbing <br />1.25% of project <br />value, based on <br />valuation table <br />n/a <br />Backflow registration <br />$10.00 <br />Plumbing minimum <br />$26.25 <br />Mechanical (All Types) <br />1.25% of project <br />value, based on <br />valuation table <br />n/a <br />Mechanical Minimum <br />$26.25 <br />Tent/ Canopy <br />$50.00 <br />Municipal Connection permit <br />n/a <br />Sewer <br />$50.00 <br />SAC (Sewer Availability Charge) (MCES) <br />$2,485.00 <br />Water <br />$50.00 <br />Septic <br />Tank or Repair Permit <br />$350.00 <br />$750.00 <br />New or replacement Type I or Type III, Residential <br />$1,000.00 <br />New or replacement Advanced Septic System <br />Residential <br />$750.00 <br />Plus additional actual costs <br />upto 600.00 <br />All Commercial <br />$750.00 <br />Plus additional actual costs <br />upto 600.00 <br />Subdivision site evaluation review <br />$60.00 <br />Per lot <br />Inspection surcharge for RS zones (Big Island and <br />$30.00 <br />Deering island) <br />plus cost of boat rental if <br />transportation not provided. <br />Reinspection fee <br />$30.00 <br />plus $60/ hour after 1st hour <br />Site inspection without permit <br />Actual costs <br />Quarterly Septic Fee <br />11.25 <br />Septic Late Fee <br />3%/Qtr <br />