My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #275 - 3rd Series - Amending 2022 Fee Schedule
Orono
>
Ordinances
>
Ord #275 - 3rd Series - Amending 2022 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 3:53:16 PM
Creation date
2/16/2024 10:25:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEWER PROJECTS <br />Connection to existing City Sewer System: <br />$5,380.00 <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) <br />shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of the <br />project: <br />Fee <br />2007 Farview Lane Sewer t" ^' <br />2010 North Farm Road <br />2014 Green Trees <br />2015 Green Trees Extension t'^� <br />Connection to Sewer System in adjacent city <br />12,775.00 <br />21,270.00 <br />22,800.00 <br />21,775.00 <br />Fee <br />$1,900.00 or per current Long Lake <br />Connection to Long Lake Sewer System <br />Fee Schedule <br />$1,000 or per current Wayzata Fee <br />Connection to Wayzata Sewer System <br />Schedule <br />12,775.00 <br />21,270.00 <br />22,800.00 <br />21,775.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.