My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #251-3rd Ser/2021 Fee Schedule
Orono
>
Ordinances
>
Ord #251-3rd Ser/2021 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 3:33:09 PM
Creation date
2/16/2024 10:25:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit C Utility Rates and Fees <br /> ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br /> Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with <br /> providing water and wastewater utility services to new customers to avoid placing these costs on existing customers.The <br /> connection fee includes those portions of existing assets that will benefit new customers together with any anticipated <br /> future capital improvements constructed for the purpose of providing utility services to new customers.The connection <br /> charge applies to those properties not previously assessed for the associated utility project. <br /> MUNICIPAL CONNECTION PERMIT <br /> Sewer $50.00 <br /> SAC(Sewer Availability Charge)(MCES) $2,485.00 <br /> Water $50.00 <br /> Horn Quote Basis <br /> Connection inspection(Water or Sewer) $100.00 <br /> Disconnection inspection(Water or Sewer) $100.00 <br /> POINT OF SALE SEWER SERVICE INFLOW&INFILTRATION INSPECTION FEES <br /> Residential $250.00 <br /> Commercial $750.00 <br /> SEWER PROJECTS <br /> Connection to existing City Sewer System: $5,380.00 <br /> Connection to City Sewer in areas still within their assessment window(less than 15 years since project was assessed) <br /> shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of <br /> the project: <br /> Fee <br /> 2004 North Long Lake East Extension $16,495.00 <br /> 2004 West Farm/Homestead $9,900.00 <br /> 2005-1 Webber Hills/S Brown Rd Ext $14,990.00 <br /> 2005-1 Dickey Lake Dr N $19,125.00 <br /> 2006-1 Jamestown Road $15,930.00 <br /> 2007 Farview Lane Sewer $12,025.00 <br /> 2010 North Farm Road $20,020.00 <br /> 2014 Green Trees $21,830.00 <br /> 2015 Green Trees Extension $20,890.00 <br /> Connection to Sewer System in adjacent city <br /> Fee <br /> Connection to Long Lake Sewer System $1,900.00 or per current Long Lake <br /> Fee Schedule <br /> Connection to Wayzata Sewer System $1,000 or per current Wayzata Fee <br /> Schedule <br /> WATER CONNECTIONS <br /> Connection to existing City Water Main $4,370 per unit <br /> *or 20%over adjacent city's fee schedule,whichever is greater of <br /> Current Fee per Adjacent City Fee <br /> Connection to Long Lake Water System $1,900.00 or per current Long Lake <br /> Fee Schedule <br /> $2,351.00 or per current Wayzata <br /> Connection to Wayzata Water System <br /> Fee Schedule <br /> WATER METER AND HORN <br /> 5/8"(3/4"x7-1/2")meter with horn including sales tax Actual Cost <br /> 3/4"(3/4"x9")meter with horn including sales tax Actual Cost <br /> 1"meter with horn including sales tax Actual Cost <br /> Larger meter Actual Cost <br /> SEWER AND WATER UNIT ADJUSTMENT CHARGES <br />
The URL can be used to link to this page
Your browser does not support the video tag.