Aaplication Adiusted Fee Escrow N tes
<br /> BUILDING CODE ADMINISTRATION:
<br /> Address Change Request by Owner $50.00
<br /> Based on Value
<br /> Building Permits Table
<br /> 65%of Building
<br /> Plan Review Fee Permit Fee
<br /> Minimum Fee $26.25
<br /> Based on Value '
<br /> Sign structure Table
<br /> Based on Value
<br /> Entrance monuments Table
<br /> 3%of project
<br /> Temporary Certificate of Occupancy Escrow value,not to !
<br /> exceed$10,000
<br /> City Administrator may require an erosion control �
<br /> escrow for projects disturbing soils. $1,000.00
<br /> Valuation based on ICC 2012 Building Valuation tables
<br /> Total Valuation Fee
<br /> $1.00 to$500 $26.25
<br /> $501.00 to$2,000.00 $26.25 for the first$500.00 plus$3.41 for each dditional
<br /> $100.00,or fraction thereof,to and including$ ,000.00
<br /> $2,001.00 to$25,000.00 $77.40 for the first$2,000.00 plus$ 5.49 for e h
<br /> additional$1,000.00,or fraction the�eof,to an including
<br /> $25,000.00 �
<br /> $25,001.00 to$50,000.00 $433.67 for the first$25,000.00 plus�$11.29 for ach
<br /> additional$1,000.00,or fraction the eof,to an including
<br /> $50,000.00 �
<br /> $50,001.00 to$100,000.00 $715.92 for the first$50,000.00 plus I$7.88 for ch
<br /> additional$1,000.00,or fraction thereof,to an �including
<br /> $100,000.00
<br /> $100,001.00 to$500,000.00 $1109.92 for the first$100,000.00 pl�s$6.30 fo each
<br /> additional$1,000.00,or fraction ther�eof,to an !including
<br /> $500,000.00 �
<br /> $500,001.00 to$1,000,000.00 $3,629.92 for the first$500,000.00 plus$5.25 f r each
<br /> additional$1,000.00,or fraction thereof,to an �iincluding
<br /> $1,000,000.00
<br /> $1,000,001.00 and up $6,254.92 for the first$1,000,000.00 plus$4.20 or each
<br /> additional$1,000.00,or fraction thereof
<br /> Demolition: Principal structure $100.00 $1,000.00
<br /> Demolition:Accessory structure $50.00
<br />
|