My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #202 - 3rd Ser/Adopting the 2018 Fee Schedule and Repealing Ordinance 200
Orono
>
Ordinances
>
Ord #202 - 3rd Ser/Adopting the 2018 Fee Schedule and Repealing Ordinance 200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:38:31 AM
Creation date
2/16/2024 10:25:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit D Utility Rates and Fees � <br /> ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br /> Connection fees have been determined as a way to provide a fair and equitable recovery of t�e costs a sociated <br /> with providing water and wastewater utility services to new customers to avoid placing these costs on xisting <br /> customers.The connection fee includes those portions of existing assets that will benefit new custome s together <br /> with any anticipated future capital improvements constructed for the purpose of providing utility servi �es to new <br /> customers.The connection charge applies to those properties not previously assessed for th�associat utility <br /> project. <br /> MUNICIPAL CONNECTION PERMIT <br /> Sewer $50.00 <br /> SAC(Sewer Availability Charge) (MCES) $2,485.00 <br /> Water �50.00 <br /> Horn Quote Basis <br /> Mail-in postage and handling surcharge $2.00 <br /> Connection inspection (Water or Sewer) $100.00 ' <br /> Disconnection inspection (Water or Sewer) $100.00 I, <br /> SEWER PROJECTS <br /> Connection to existin Cit Sewer S stem: $5,100.00 <br /> g Y Y <br /> Connection to City Sewer in areas still within their assessment window(less than 15 yeArs since p oject was <br /> assessed)shall pay a prorated amount equivalent to the assessment residences were charged at he time <br /> of the project: i <br /> Fee <br /> 2004 North Long Lake East Extension $14,610.00 ; <br /> 2004 West Farm/Homestead $8,765.00 <br /> 2005-1 Webber Hills/S Brown Rd Ext $13,280.00 ' <br /> 2005-1 Dickey Lake Dr N � <br /> 2006-1 Jamestown Road $14,110.00 <br /> 2007 Farview Lane Sewer $10,650.00 <br /> Connection to Sewer System in adjacent city I' <br /> � <br /> Fee <br /> Connection to Long Lake Sewer System $1,900.00 or per curren�Long <br /> lake Fee Schedule � <br /> Connection to Wayzata Sewer System $1,000 or per current W�ayzata <br /> Fee Schedule <br /> WATER CONNECTIONS <br /> Connection to existing City Water Main:$4,240 <br /> Connection to Water system in adjacent city Fee <br /> Connection to Long Lake Water System $1,900.00 or per curren Long <br /> Lake Fee Schedule <br /> Connection to Wayzata Water System $2221.00 or per current I <br /> Wayzata Fee Schedule <br /> �I <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.