My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #200 - 3rd Ser/Adopting the 2017 Fee Schedule and Repealing Ordinance No. 161 and Summary Ordinance
Orono
>
Ordinances
>
Ord #200 - 3rd Ser/Adopting the 2017 Fee Schedule and Repealing Ordinance No. 161 and Summary Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 4:33:32 PM
Creation date
2/16/2024 10:25:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- acreage of newly-created wetland. <br /> - acreage of stormwater ponding or similar improvements that provide additional treatment benefits beyond what is required to treat the stormwater runoff from the <br /> development site. <br /> - acreage of conservation easements resulting from Conservation Design process. <br /> 5.Maximum fee.For the one-acre zoning districts,any lot exceeding 1.0 gross acres,including wetland,shall be charged a maximum trunk fee equal to the trunk fee for a 1.0 acre parcel. <br /> 6.Maximum fee.For the 1/2-acre zoning districts,any lot exceeding 0.5 gross acres,including wetland,shall be charged a maximum trunk fee equal to the trunk fee for a 0.5 acre parcel. <br /> 7.Multi-family and High-Density Single Family Developments. Trunk fee shall be charged on a per-acre basis,except that the following acreages will not be subject to the trunk fee: <br /> - all wetland acreage�p to the delineation line <br /> - acreage of stormwater ponding or similar improvements that pmvide additional treatment benefits beyond what is required to treat the stormwater runoff from the <br /> development site. <br /> - acreage of conservation easements resulting from Conservation Design process <br /> ZONING PERMIT <br /> City Administrator may require an erosion control escrow for projects disturbing soils $1,000.00 <br /> �oE�s s�e.� <br /> ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br /> Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing water and wastewater utility services to new <br /> customers to avoid placing these costs on existing customers.The connection fee includes those portions of existing assets that will benefit new customers together with any <br /> anticipated future capital improvements constructed for the purpose of providing utility services to new customers.The connection charge applies to those properties not previously <br /> assessed for the associated utility project. <br /> 2017 Fee Schedule-Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.