Temporary Certificate of Occupancy $ 10,000.00 3%of pmject value,not to exceed$10,000
<br /> City Administrator may require an erosion control
<br /> escrow for projects disturbing soils. $ 1,000.00
<br /> Valuation based on ICC 2012 Building Valuation
<br /> tabtes
<br /> Total Valuation Fee
<br /> $1.00 to$500 $26.25
<br /> $501.00 to$2,000.00 $26.25 for the 6rst$500.00 plus$3.41 for each additional$100.OQ or fraction thereof,to
<br /> and including$2,000.00
<br /> $2,001.00 to$25,000.00 $77.40 for the first$2,000.00 plus$15.49 for each additional$1,000.00,or fraction
<br /> thereof,to and including$25,000.00
<br /> $25,001.00 to$50,000.00 $433.67 for the first$25,000.00 plus$11.29 for each additional$1,000.00,or fraction
<br /> thereof,to and including$50,000.00
<br /> $50,001.00 to$100,000.00 $715.92 for the first$50,000.00 plus$7.88 for each additional$1,000.00,or fraction
<br /> thereof,to and including$100,000.00
<br /> $100,001.00 to$500,000.00 $1109.92 for the first$100,000.00 plus$630 for each additional$1,000.00,or fraction
<br /> thereof,to and including$500,000.00
<br /> $500,001.00 to$],000,000.00 $3,629.92 for the first$500,000.00 plus$5.25 for each additional$1,000.00,or fraction
<br /> thereof,to and including$1,000,000.00
<br /> $1,000,001.00 and up $6,254.92 for the first$1,000,000.00 plus$4.20 for each additional$1,000.00,or
<br /> fraction thereof
<br /> Demolition:Principal structure $ 100.00 $ 100.00 $ 1,000.00
<br /> Demolition:Accessory structure $ 50.00 $ 50.00
<br /> Based on Value Based on Value
<br /> Retaining walis Table Table $ 1,000.00 May require CUP
<br /> Plumbing 1.25%of project 1.25%of project n/a
<br /> Backflow registration $ 10.00 $ 10.00
<br /> Plumbing minimum $ 50.00 $ 26.25
<br /> Mail-in postage and handling surcharge $ 2.00 $ 2.00
<br /> Mechanical(All Types) 1.25%of pmject 1.25%of project n/a
<br /> Mechanical Minimum $ 50.00 $ 26.25
<br /> Tent/Canopy $ 50.00 $ 50.00
<br /> Mail-in postage and handling surcharge $ 2.00 $ 2.00
<br /> Municipal Connection pernut n/a
<br /> Sewer $ 50.00 $ 50.00
<br /> SAC(Sewer Availability Charge)(MCES) $ 2,485.00 $ 2,485.00
<br /> Water $ 50.00 $ 50.00
<br /> Hom Quote Basis Quote Basis
<br /> Mail-in postage and handling surcharge $ 2.00 $ 2.00
<br /> Septic n/a
<br /> Residential System Permit,Repair $ 100.00 $ ]00.00
<br /> Residential System Permit,New/replace $400+20 per insp $ 460.00
<br /> Non-Residential System Permit $200+20 per insp $ 260.00
<br /> Subdivision site evaluation review $ 60.00 $ 60.00 Per lot
<br /> Inspection surcharge for RS zones(Big and Deering $ 30.00 $ 30.00 plus cost of boat rental if
<br /> island transportation not
<br /> provided.
<br /> plus 30/hour after lst
<br /> Reinspection fee $ 30.00 $ 30.00 hour
<br /> Site inspection without permit $ 30.00 $ 30.00
<br /> $45.00/per year,plus$45.00/per year, plus
<br /> late fee plus 8%late fee plus 8%
<br /> interest for u�paid interest for unpaid
<br /> Annual Septic Fee charges charges
<br /> Septic Late Fee $ 10.00 S 10.00
<br /> Contractural Inspection Service
<br />
|