My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #179 - 2017 Fee Schedule
Orono
>
Ordinances
>
Ord #179 - 2017 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2017 12:18:06 PM
Creation date
2/16/2024 10:25:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Applicable <br /> Permit Tvae Fee Code Section <br /> NOTE: Retaining walls in 0-75' lakeshore protected zone (per 2008 Building Permit Fee Table Based on Valuation) <br /> -see Cond.Use Permit section of fee schedule. <br /> Application Escrow: Grading,Excavation and Filling $2,000.00 Ord.42,3�d Series <br /> Application Escrow:New Home/Addition/New Structure $2,500.00 minimum Ord.42,3�d Series <br /> *includes Erosion Control per Section 79 <br /> TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW(winter conditions) $10,000 <br /> DEMOLITION PERMIT Ord.216 <br /> Principal Structure $75.00 Initial inspection <br /> $25.00 for each requested <br /> or required inspection beyond initial inspection <br /> Accessory Structure $50.00 Initial inspection <br /> Application and Erosion Control Escrow $2,500.00 <br /> ENCROACHMENT PERMIT/ENCROACHMENT AGREEMENT $150.00 <br /> TENT/CANOPY PERMITS $50.00 <br /> WETLAND BUFFER ESCROW $2,000.00 minimum 78-1601 (c); 78-1605 <br /> Amount to be determined based on project <br /> ZONING PERMIT <br /> DOCKS-RESIDENTIAL $50.00 <br /> [Permanent(CUP Required)and Initial Seasonal] <br /> DOCKS-COMMERCIAL $50.00+engineering charges <br /> Application Escrow: Grading,Excavation and Filling $2,000.00 Ord.42,3'd Series <br /> *includes Erosion Control per Section 79 <br /> GRADING, EXCAVATION, FILLING/LAND <br /> ALTERATION 500 cubic yards or <br /> less $50.00+engineering charges <br /> 501 +cubic yards $50.00+Conditional Use Permit <br /> NOTE: 501 cubic yards or more requires a Conditional Use Permit <br /> unless approved as part of building permi� <br /> Application Escrow: Grading,Ezcavation and Filling $2,000.0(1 Ord.42,3�d Series <br /> *includes Erosion Control per Section 79 <br /> 2017 Fee Schedule-Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.