My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #161-3rd Ser/2016 Final Fee Schedule
Orono
>
Ordinances
>
Ord #161-3rd Ser/2016 Final Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2015 2:50:33 PM
Creation date
2/16/2024 10:25:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Applicable <br />Permit Type Fee Code Section <br />NOTE: Retaining walls in 0-75' lakeshore protected zone <br />- see Cond. Use Permit section of fee schedule. <br />Application Escrow: Grading, Excavation and Filling <br />Application Escrow: New Home/Addition/New Structure <br />*includes Erosion Control per Section 79 <br />TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW (winter conditions) <br />DEMOLITION PERMIT <br />Principal Structure <br />Accessory Structure <br />Application and Erosion Control Escrow <br />ENCROACHMENT PERMITIENCROACHMENT AGREEMENT <br />TENT/CANOPY PERMITS <br />WETLAND BUFFER ESCROW <br />ZONING PERMIT <br />DOCKS - RESIDENTIAL <br />[Permanent (CUP Required) and Initial Seasonal] <br />DOCKS - COMMERCIAL <br />Application Escrow: Grading, Excavation and Filling <br />*includes Erosion Control per Section 79 <br />GRADING, EXCAVATION, FILLING/LAND ALTERATION <br />501 + cubic yards <br />NOTE: 501 cubic yards or more requires a Conditional Use Permit <br />unless approved as part of building permit. <br />Application Escrow: Grading, Excavation and Filling <br />*includes Erosion Control per Section 79 <br />(per 2008 Building Permit Fee Table Based on Valuation) <br />$2,000.00 <br />$2,500.00 minimum <br />$10,000 <br />Ord. 42, 3' Series <br />Ord. 42, 3'd Series <br />Ord. 216 <br />$75.00 Initial inspection <br />$25.00 for each requested <br />or required inspection beyond initial inspection <br />$ 50.00 Initial inspection <br />$2,500.00 <br />$150.00 <br />$50.00 <br />$2,000.00 minimum 78-1601(c); 78-1605 <br />Amount to be determined based on project <br />$50.00 <br />$50.00 + engineering charges <br />$2,000.00 <br />$50.00 + Conditional Use Permit <br />$2,000.00 <br />Ord. 42, 3'O Series <br />Ord. 42,31 Series <br />2016 Fee Schedule -Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.